Low Investments in Transmission and Distribution System The investment on T&D system in our country has commonly been lower than that on generation. It is hugely believed in

Q. Explain the working principle of an opto coupler? When it is necessary to block the voltage between one electronic circuit and another, and transfer the signal at the same t

TRAP has the maximum priority There are 2 types of interrupts external and internal. NMI has highest priority between all external interrupts,TRAP has highest priority between

Q. Explain the action of a pn-junction with bias. Consider both the forward bias and the reverse bias, and use sketches wherever possible.

Explain Hysteresis loop. Hysteresis loop: In a ferromagnetic material, the flux density B raises while external applied magnetic field H to it is raised. When the saturation

Q. Explain Cathode-ray tube? While the CRT display is one of the oldest, it still remains one of the most popular display technologies. The raster-scanned display devices work

Use the offset diode model with a threshold voltage of 0.6 V to determine the value of v 1 for which the diode D will first conduct in the circuit of Figure(a).

i have an assignment. please help me.

Q. A negative impedance converter is used, as shown in Figure. Show that the load current i L is given by v in /R, which is independent of Z L . Note that since the load sees a cu