Management responsibility on quality control, Project Management

Management Responsibility

a. The quality policy shall be defined documented understood implemented and maintained.

b. Responsibilities and authorities for all personnel specifying achieving and monitoring quality shall be defined. In house verification resources shall be defined, trained and funded. A designated management person sees that the Q91 program is implemented and maintained.

Quality Systems

a. Procedure shall be prepared.

b. Procedure shall be implemented.

Contract Review

a. Incoming contracts ( and purchase orders) shall be reviewed to see whether the requirements are adequately defined agree with the bid, and can be implemented.

Design Control

a. The design project shall be planned,

b. Design input parameters shall be defined,

c. Design output including crucial product characteristics shall be documented.

d. Design output shall be verified to meet input requirements,

e. Design changes shall b e controlled.

Posted Date: 3/26/2013 3:37:28 AM | Location : United States







Related Discussions:- Management responsibility on quality control, Assignment Help, Ask Question on Management responsibility on quality control, Get Answer, Expert's Help, Management responsibility on quality control Discussions

Write discussion on Management responsibility on quality control
Your posts are moderated
Related Questions
summarise the argument for such a policy of partnering with a major supplier such as BAA and MACE HAVE DON HERE

Give an example of demonstrating a network or critical path by given activity and duration. Activity                      Duration (Wks)                   Preceded by

Explain the products which typically result by the given project stages: Project Start-up; Analysis of Needs; Design Integration and Testing. Typical products include: •Pro

Risk Management Responsibilities   Each and every person in the project team has a responsibility of performing a particular task and must indulge in risk management process. T

Tolerance and Surface Finish Design engineers are always blamed of specifying closer tolerances than necessary. It  is obvious that to achieve a tolerance of ± 0.001 mm is mor

X Company, a private security firm, has signed a contract to fund the design, construction and running of a local police station. This arrangement is a public private partnership a

You are not expected to submit a formal proposal. However, you will be able to access Subject Tutors via HenleyConnect and you may seek feedback from them as to the suitability and

Laudon & Laudon''s Four-Step Problem-Solving & IS-Building Model and/or the Integrated Framework for Describing and Analyzing Information Systems to:  investigate persisting busin

Define the term Earned Value Management in short. Earned Value Management (EVM): Earned Value Management (EVM) is a project management system which combines schedule and

Disadvantages of Product Layout - Inflexibility Inflexibility is a drawback of this type of layout. The equipment laid out is designed to perform specific operations. No machi