Grouted or penetration macadam, Civil Engineering

Grouted or Penetration Macadam:

This is a specification where the binder is sprayed on a compacted layer of stone aggregates and is allowed to penetrate and bind the aggregates. A layer of intermediate aggregates, called key aggregates, is spread on the layer and rolled. A seal coat is provided to seal the surface.

For a 50 mm compacted thickness, the quantity of coarse aggregates is 0.60 cu m per 10 sq m area, the quantity of binder is 50 kg per 10 sq m, and the quantity of key aggregates is 0.15 cu m per 10 sq m. The seal coat is similar to the seal coat provided for a PC.

The advantage of penetration macadam is that it does not require a mixing plant. The advantage is that it uses a high quantity of binder. The specification is hardly used now-a-days.

Posted Date: 1/22/2013 4:47:14 AM | Location : United States







Related Discussions:- Grouted or penetration macadam, Assignment Help, Ask Question on Grouted or penetration macadam, Get Answer, Expert's Help, Grouted or penetration macadam Discussions

Write discussion on Grouted or penetration macadam
Your posts are moderated
Related Questions
Question Explain components of a typical expansion joint? Answer Dowel bar-This is major component of joint. It serves to guide direction of movement of concrete growth. Therefo

Question Is it true that rational process has to not be used for large catchments in estimating peak runoff ? Answer Rational process is appropriate for small catchme

TYPE OF FOUNDATION IN LATERITE SOIL

Q. Describe types of Spurs? Spurs can be of varied types. They may be either permeable or impermeable. Permeable spurs are open structures constructed by driving wooden balties

Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on

The head (energy) loss in the piping system between points 1 and 7 is the most nearly. Solution: 3 ft. The difference between point 1 and point 7 = 10 ƒt - 7 ƒt = 3 ƒt

Basic things used in road construction: Water Absorption : The quantity of water absorbed by aggregates. Aggregate Impact Value : The percentage by weight of crushed ma

Example. With a surveyor compass the angles observed in traversing the lines AB, BC, CD, DE and EF are  as. Compute the included angles and indicate them in a neat sketch.


Enumerate the Variation in tendon stress In post-tensioned construction, several tendons are simultaneously stretched and anchored at the ends. It is assumed that all tendons