Grouted or penetration macadam, Civil Engineering

Grouted or Penetration Macadam:

This is a specification where the binder is sprayed on a compacted layer of stone aggregates and is allowed to penetrate and bind the aggregates. A layer of intermediate aggregates, called key aggregates, is spread on the layer and rolled. A seal coat is provided to seal the surface.

For a 50 mm compacted thickness, the quantity of coarse aggregates is 0.60 cu m per 10 sq m area, the quantity of binder is 50 kg per 10 sq m, and the quantity of key aggregates is 0.15 cu m per 10 sq m. The seal coat is similar to the seal coat provided for a PC.

The advantage of penetration macadam is that it does not require a mixing plant. The advantage is that it uses a high quantity of binder. The specification is hardly used now-a-days.

Posted Date: 1/22/2013 4:47:14 AM | Location : United States







Related Discussions:- Grouted or penetration macadam, Assignment Help, Ask Question on Grouted or penetration macadam, Get Answer, Expert's Help, Grouted or penetration macadam Discussions

Write discussion on Grouted or penetration macadam
Your posts are moderated
Related Questions
how to sway portal frame both end fixed due to eccentric loading with diagram

Ductility Test: The ductility of a bituminous binder is its ability to deform under load and return to its original condition after removal of the load. The property is deter


Maintenance of Bituminous Roads: The common defects noticed in a bituminous road are : potholes cracks rutting corrugations shoving stripping and l

how can you draw contours of a non square grid?

TIMBER Timber refers to wood utilized for construction works. Actually the word timber is derived from an old English word 'Timbrian' that means 'to build'. A tree that yields


Define Diving Equipments for Underwater Inspection of Bridge? Generally two types of diving, Scuba diving and surface supplied air diving, is employed in underwater inspection

Question Shall layer of wearing course or additional thickness be designed on surface of piers ? Answer In designing of piers , considerations have to be given to

what are the dimensions of a sheet of paper required for plotting a traverse ABCDE with 1 : 250 scale if a margin of 4 cm to the right and left sides and a6 cm margin to the other