Q. What do you know about Shallow Piers?
In case of some of the existing bridges, piers may be shallow and grip may be found to be inadequate. Protection round piers is then required to be given for their safety. Minimum grip essential for safety is worked out as 1/4 the total height of existing pier from bottom to design H.F.L. At this level bed scour is required to be arrested by providing stone apron with adequate quantity to fully cover scoured face. Launching slope in sandy bedded rivers is assumed as 2 horizontal to 1 vertical. Size and thickness are assumed same as in case of apron of the guide bunds. If one man stone is found to be of insufficient weight to be stable, concrete blocks or stone crates are required to be used. Placing stone round piers at unnecessary higher level is inadvisable as it is liable to be displaced and washed down more easily. At the same time it is not a safe and feasible proposition to wait till river bed scours to just the safe level of 1/ 4 height to ensure minimum grip length. Dumping of stone has, therefore, to be resorted to a little earlier before the lowest safe level is reached.
difference between piles and pier
Question What are designing considerations for dowel bars in joints of concrete carriageway? Answer Behaviour of dowel bars resembles that of piles in soils subject
Design of Flexural Members: Here you have learnt how to design simple steel beams of rolled steel sections subjected to transverse loading. You have also known how to take
Roads in Marshy Areas: The Problems Encountered Roads passing through marshy and swampy ground and waterlogged areas have stable ground generally in a saturated condi
Difinaction of stair
Purification and Treatment of Water: In purification and treatment of water, we have discussed the important treatment process which is commonly used in making raw water from
Explain Flocculation Most important factor effecting particle removal efficiency objective - to bring particles into contact so that they will collide, stick together
what is the heat of hydration and gel space ratio?
Prime Coat: A prime coat is the application of a low viscosity binder, usually a bituminous emulsion, to a gravel, WBM or WMM surface, to enable the binder to fill up the voi
Depth of Boring for Multi-storeyed Building Peck has recommended that first drill hole is to be made up to depth at which the presence of a thick layer of soft clay with a hig
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd