Q. What do you know about Shallow Piers?
In case of some of the existing bridges, piers may be shallow and grip may be found to be inadequate. Protection round piers is then required to be given for their safety. Minimum grip essential for safety is worked out as 1/4 the total height of existing pier from bottom to design H.F.L. At this level bed scour is required to be arrested by providing stone apron with adequate quantity to fully cover scoured face. Launching slope in sandy bedded rivers is assumed as 2 horizontal to 1 vertical. Size and thickness are assumed same as in case of apron of the guide bunds. If one man stone is found to be of insufficient weight to be stable, concrete blocks or stone crates are required to be used. Placing stone round piers at unnecessary higher level is inadvisable as it is liable to be displaced and washed down more easily. At the same time it is not a safe and feasible proposition to wait till river bed scours to just the safe level of 1/ 4 height to ensure minimum grip length. Dumping of stone has, therefore, to be resorted to a little earlier before the lowest safe level is reached.
Q. What do you mean by M A S Accounts? This stands for material at site account. This is a suspense head of account that is maintained to watch actual consumption of materials
A steam turbine with base 6 m × 3.6 m weighs 10,000 kN. It is to be placed on a clay soil with c = 135 kN/m 2 . Find the size of the foundation needed if the factor of safety is to
Construction: Construction is usually done by one of the three methods: (a) Manual method, providing steel or wooden forms, pouring concrete and compacting by means of nee
Define Superposition Method 1. Remove enough redundant supports to reduce the structure to a statically determinate condition 2. Calculate the deflections at the previous l
Explain the Tertiary Treatment for Wastewater Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water
applications of distomat in briefly
Determine the Statements about Unit Area or Borrow Pit? Ans: I. Sometimes called Average Depth II. Works well for volumes for building sites and surface mines III. Needs
Explain the Scaling - underwater inspection of bridges? Scaling is the gradual and continuing loss of the surface mortar and aggregate over an area. This condition is commonly
Disadvantages of cement sand mortor
Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd