What do you know about shallow piers, Civil Engineering

Assignment Help:

Q. What do you know about Shallow Piers?

In case of some of the existing bridges, piers may be shallow and grip may be found to be inadequate. Protection round piers is then required to be given for their safety. Minimum grip essential for safety is worked out as 1/4 the total height of existing pier from bottom to design H.F.L. At this level bed scour is required to be arrested by providing stone apron with adequate quantity to fully cover scoured face. Launching slope in sandy bedded rivers is assumed as 2 horizontal to 1 vertical. Size and thickness are assumed same as in case of apron of the guide bunds. If one man stone is found to be of insufficient weight to be stable, concrete blocks or stone crates are required to be used. Placing stone round piers at unnecessary higher level is inadvisable as it is liable to be displaced and washed down more easily. At the same time it is not a safe and feasible proposition to wait till river bed scours to just the safe level of 1/ 4 height to ensure minimum grip length. Dumping of stone has, therefore, to be resorted to a little earlier before the lowest safe level is reached.


Related Discussions:- What do you know about shallow piers

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Pumps, largest centrifugal pumps

largest centrifugal pumps

Bond performance of bar reinforcement, Question Does occurrence of rust hav...

Question Does occurrence of rust have adverse collision to bond performance of bar reinforcement ? Answer In fact, presence of rust in bars cannot have adverse impact to the bo

Diffrence between concrete road and bituminous road, Q. Diffrence between C...

Q. Diffrence between Concrete road and bituminous road? Concrete road belongs to rigid pavement and they don't deflect under traffic loads. Quite the reverse, bituminous pavem

Minimum volume of sump volume for pumps, Minimum volume of sump volume for ...

Minimum volume of sump volume for pumps Maximum pumping rate = Q P Volume of sump = V Inflow Rate = Q i Cycle Time T c = t 1 + t 2 t 1 = V / Q P - Q i t 2

SETTLEMENT OF SOIL AND BRACING OF RETAINING WALL OF BASEMENT, STRUCTYRE IS ...

STRUCTYRE IS HAVING BASEMENT JUST WITH THE SIDE OF FOUNDATION WHICH CAUSED SETTLEMENT AND CRACKS IN THE STRUCTURES

Laplace transform, Using Laplace transfom, the following differential equat...

Using Laplace transfom, the following differential equation d y dy dt reduces to the algebraic equation of the form Resolve y(s) into partial fractions

Explain about the pre-tensioning systems, Pre-tensioning systems In the...

Pre-tensioning systems In the previous unit we have seen different steps in a pretensioning operation. Tendon wires or strands (formed as a rope type arrangement made of  sever

Harbours, natural phenomenon affecting the designs of harbours

natural phenomenon affecting the designs of harbours

Foundation, Explain briefly shallow foundation?

Explain briefly shallow foundation?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd