Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. What do you know about Shallow Piers?
In case of some of the existing bridges, piers may be shallow and grip may be found to be inadequate. Protection round piers is then required to be given for their safety. Minimum grip essential for safety is worked out as 1/4 the total height of existing pier from bottom to design H.F.L. At this level bed scour is required to be arrested by providing stone apron with adequate quantity to fully cover scoured face. Launching slope in sandy bedded rivers is assumed as 2 horizontal to 1 vertical. Size and thickness are assumed same as in case of apron of the guide bunds. If one man stone is found to be of insufficient weight to be stable, concrete blocks or stone crates are required to be used. Placing stone round piers at unnecessary higher level is inadvisable as it is liable to be displaced and washed down more easily. At the same time it is not a safe and feasible proposition to wait till river bed scours to just the safe level of 1/ 4 height to ensure minimum grip length. Dumping of stone has, therefore, to be resorted to a little earlier before the lowest safe level is reached.
Topic request
Explain the concept of average velocity
Q. What are the various impurities in water? Ans.- Impurities in water - The impurities in water are classified as - i. Suspended Impurities. ii. Colloidal Impuritie
Tests on Cement: The following tests are conducted on cement in a project site: Setting Time Initial setting time Final setting time Compressive Streng
does the truss pitch relate to the building''s height?
Resultant Force on a Given Area of a Horizontal Plane By equation, the total vertical force applied to an area A on the plane is: Resultant Force R = ΡA = (lb/ft 2 )(ft 2 )
i would like to get a project done. I have some plans and I need a cost estimate on how much it will cost to get it constructed.
Stabilised Pavement Layers: Soil stabilisation is the process of treating a soil in such a manner as to alter and improve its properties for use as a pavement layer on sub-gr
Two readings ie 1.64m and 0.73m were taken during leveling procedure to define the slope of a centerline of a bridge at points A and B. If distance AB=50 m, find the slope of line
Question What is the sucker deck principle for changeable depth bridge decks ? Answer For a variable depth bridge deck, depth of continuous multi-span bridge deck is greate
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd