Construction of lacashire boiler, Mechanical Engineering

Construction of Lacashire boiler:

CONSTRUCTION: Consists of boiler shell which contains water and steam. Diameter can vary from 1.75 to 2.75 m and length can be 7.25 - 9 m.  It has 2 side channels connected to rear end of boiler shell and then finally to chimney. To provide larger heating surface area it has 2 large diameter flue gas tubes. The tubes are tapered with the larger diameter in front and smaller diameter at back. The taper is provided to accommodate grate. Two grates are provided at front end of flue gas tubes.  For controlling flow of flue gases the two dampers are provided at rear end. Further for cleaning and inspection of drum, manhole is also provided. Other boiler mountings such as feed check valve, water level gauge, pressure gauge, steam stop valve, blow off cock are also provided.

 

Posted Date: 10/20/2012 2:51:25 AM | Location : United States







Related Discussions:- Construction of lacashire boiler, Assignment Help, Ask Question on Construction of lacashire boiler, Get Answer, Expert's Help, Construction of lacashire boiler Discussions

Write discussion on Construction of lacashire boiler
Your posts are moderated
Related Questions
Computers control system in flexible manufacturing system

(a) What are the causes of high fuel consumption? (b) How can the problem of "motorcycle pulls to one side" be corrected? (c) How can engine overheating problem be solved?

Q. Describe about Chain-wire and tape gauges? Chain, wire and tape gauges are fixed on structures like bridges and the weight is lowered to touch the water surface. Movable sti

Cooling System: A cooling system is designed to remove a part of heat generated inside the cylinder that may be harmful to engine parts. The heat is produced in the engine cylinde

Crank Pin and Crank Shaft - Part of combustion engine: Cran k Pin: Crank pin is region on crank shaft on which big end of connecting rod is attached. These pins are eccentr

sir/madam, i would like to teach online how can i have to proceed

Project is about Heat exchanger kit named TE 93.....Project guide has told us to do something with it..without modifying the project largely.....i came up with change of material o

Derivation of displcement equation of cycloidal motion related to follower

example of 2nd corollary of first law of thermodynamics

Grinder: Grinders are used to sharpen the cutting edges of the tools. They are basically fast rotating grinding wheels carried at one or two ends of a shaft. The grinding wheel ar