Create a schedule for the Storage Building to include all areas of work (the entire project) and complete the CPM Activity Data Sheet included in theCPM handout. The schedule is to have a minimum of 25 activities. The Owner has defined in the contract documents that the contractor will be allowed a total duration (from Notice-to-Proceed to Substantial Completion) of 250 days (so your schedule should be slightlyless than or equal to 250 days).
The schedule can be developed either by hand or using scheduling software (Microsoft Project, Primavera SureTrak, etc.), just as long as the Activity Data Sheet is completed. (Hint: Project and Suretrak will automatically create a network diagram once bar chart information has been input).
A circular hole of diameter 11.42 + and - 0.03 inches is cut out of the plate. Also, using the tolerances given, determine the minimum possible area of the top surface of the metal plate.
Verify that the Hazen Williams equation
A model of a submarine, at 1:15 scale, is to be tested at 0.8 ft/s in a wind tunnel at standard at mospheric pressure, while the prototype will be operated in seawater. Both the air and water are at 10 C (50 F).
Compute the required weight of coarse aggregate per cubic yard. to adjust the mix so as to increase the compressive strength, the water-to-cement ratio is reduced to 0.45. will the quantity of coarse aggregate increase, decrease, or stat the same
A trapezoidal channel is to be excavated in alluvial material on a bed slope of 1:10000. The side slopes will be 1(vertical) : 2(horizontal). Details of the bed material are as follows: Particle diameter 4 mm
The distance covered by an aerial photograph is determined by both the focal length of the camera and the tilt of the camera. Although the tilt is usually small, both archaeological and Canadian photographs often use larger tilts.
Design the temperature reinforcement, tie bars, and dowel bars for a highway concrete pavement with 13 inch slabs, f'c=3500 psi, traverse joints at 35 ft apar,t and with 3 12 ft lanes each way. Use grade 60 steel
an electric motor is rated at 10 horsepower hp and costs 800. its full load efficiency is specified to be 85. a newly
The profile of the bridge and tunnel. Devise a vertical alignment to connect the tunnel and bridge by determining the highest common design speed for the sag and crest (equal tangent) vertical curves needed.
Water flows through 800 feet of 12-inch diameter iron pipe (g = 0.0018 inches) between 2 open storage tanks, whose water surface elevation difference is 16 feet. The pipe entrance is flush and square edged
A cylindrical tank is used to store water for a town. on any given day, the water supply inflow per day may fill the tank with additional 6, 7, or 8ft of water
The concentration of CO2 is 400ppm what is the equivalent concentration in ug/m^3 at temperature of 22C & pressure of 103.198 kPa.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd