Create a schedule for the Storage Building to include all areas of work (the entire project) and complete the CPM Activity Data Sheet included in theCPM handout. The schedule is to have a minimum of 25 activities. The Owner has defined in the contract documents that the contractor will be allowed a total duration (from Notice-to-Proceed to Substantial Completion) of 250 days (so your schedule should be slightlyless than or equal to 250 days).
The schedule can be developed either by hand or using scheduling software (Microsoft Project, Primavera SureTrak, etc.), just as long as the Activity Data Sheet is completed. (Hint: Project and Suretrak will automatically create a network diagram once bar chart information has been input).
Calculate the R-value for the wall assembly. This calculation should be done by hand, on engineering paper, and handed in during class (or scanned and submitted online).
if a residential space heater burns anthricite coal having a sulfur of 2.85% what would be the emissions of sulfur dioxide from having burned 900 ib of this coal. use ap-42 table 1.2-1 sulfur dioxide emission=[SO2] pounds.
Determine the number of completely mixed chlorine contact chambers each having a detention time of 30 min that would be required in a series arrangement to reduce the bacterial count of a treated effluent form 10^6 to 14.5 organisms/mL
To avoid the salinization of soil in a farming area, parallel drainage canals are to be installed to maintain the water table at a depth of at least 4m below the ground surface. It is thought that no evapo-transpiration would occur below that dept..
The entrance to Mt. Hood Meadows (elevation 3,075 ft at the point of crossing) is grade separated from Viking highway (elevation 3,050 ft at the point of crossing) and will have to be connected. The two roadways intersect at a right angle.
Find the area of steel reinforcement required for a concrete T-beam for the following data; f'c = 3 ksi, fy=60 ksi,d=18 in, t= 4.5 in., bw= 10 in., bf= 36 in., 3/4" aggregate, and the section sustains a total factored bending moment 82 k-ft.
Estimate how much carbon (in pounds) must be purcahsed for a typical 2-bed carbon adsorption system to treat 5000 cfm of air at 95 degrees F and 1 atm. The air contains 600 ppm of styrene.
A storm sewer is carrying snow melt containing 1200 mg/L of NaCl into a small stream. The stream has a naturally occurring NaCl concentration of 20 mg/L. If the storm sewer flow rate is 2000 L/min and the stream flow is 2.0
A pneumatic-tired tractor with a 354 - hp engine has a maximum speed of 3.6 mph in 1st gear. Determine the max. rimpull of the tractor in each gear if the engine effieicency is 91%.
Determine the surface area of a primary settling tank sized to be handle a maximum hourly flow of 0.570 m3/s at an overflow rate of 60 m/day.If the effective tank depth is 3.0 m,what is the effective theoretical detention time?
a child is flying a kite at a height of 40 ft and the kite is moving horizontally at a rate of 3 ft/sec. if the string is taut, at what rate is the string being paid out when the length of the string is 50 feet.
An industry discharges .5m^3/s of waste with a 5 day CBOD of 500 mg/l to a river with a flow of 2 m^3/s and a 5 day CBOD of 2 mg/l calculate the 5 day CBOD of the river after mixing with the waste.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd