How many grder hours will be required to accomplish the job

Assignment Help Civil Engineering
Reference no: EM13314155

25 miles of gravel road require to be reshaped and releveled. A motor grader will require 2 pases at 3 mph., 2 pases at 4 mph., and 2 passes at 5.5 mph. to accomplish the work How many grder hours will be required to accomplish this job if the job efficiency factor is 0.75.

Reference no: EM13314155

Questions Cloud

How many trucks are required nd what is production of system : On a shovel/truck operation the production of the shovel is 293 BCY/h and a job efficiency of 0.75. The trucks used have a capacity of 12 BCY and have a cycle time of 45 min.(excluding loading).
Calculate the length of filament that you need : You are to design a tungsten filament light bulb that has a power of 60W when it is connected to 120V at which condition its temperature is expected to be 1020C. Calculate the length of filament that you need
Explain the empirical formula of the compound : A certain ionic lattice consists of a ccp sublattice of cations. The anions occupy all of the tetrahedral sites. What is the empirical formula of the compound
Estimate the maximum total power needed : Squaw Valley ski area in California claims that its lifts can move 48300 people per hour. estimate the maximum total power needed
How many grder hours will be required to accomplish the job : A motor grader will require 2 pases at 3 mph., 2 pases at 4 mph., and 2 passes at 5.5 mph. to accomplish the work How many grder hours will be required to accomplish this job if the job efficiency factor is 0.75.
Find the swell and shrinkage and load and shrinkage factors : material (LCY) in 12 yard dump trucks, placing it, and compacting the weight of the soil is 3,750 lb/cu.yd. (30 pts.) (show your calculations) a) Find the Swell and Shrinkage b) Load and Shrinkage Factors
Explain the reaction mixture is neutralized with naoh : In the work-up procedure the reaction mixture is neutralized with NaOH (aq) and then extracted twice with diethyl ether. Explain why this is done. This was for an OChem Menthone lab.
Find the minimum length of runway required for the landing : Find the minimum length of runway required for the landing (I found to be 300ft). Find the position on the runway where the speed is 50ft/s and the time it takes for the speed to reach 50ft/s
Why is the order of the execution of two processes important : Modify the code so that the senderReceiver process sends then receives repeatedly suspending itself for 3 seconds between each iteration.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine what is the maximum intensity

During a 60 minute storm the following amounts of rain fell during successive 15 minute intervals: 33mm, 23mm, 15mm, and 5mm. What is the maximum intensity

  Calculate the water or cement ratio of the cement paste

Calculate the water/cement ratio of the cement paste in which all the cement will hydrate to leave no capillary pores. (density of cement: 3.1 g/cm3) ?

  Compute the factor of safety by using an effective stress

A 2:1 natural slope is underlain by a 3-m thick (measured vertically) soil cover over bedrock. Compute the factor of safety by using an effective stress infinite slope analysis with c'=0 and o' (theres a line between that)= 35 degrees for the soil..

  What is the future worth of per year of each plan at age 85

Mike and Susan hope to retire a few years early, they decided to pay closer attention to the predicted amount of retirement benefits and do some analyses on the numbers.

  Compute the modulated wavelength under the humidity

The average slope distance of 500m was measured with utilizing infrared light with wavelength = .91 um has a modulating frequency at 24.5 MHz. At the time of the measurement, the temperature was 27 degrees C and the atmospheric pressure was 755.1 ..

  How long is the irrigation boom from the center pivot

1.How long is the irrigation boom (in feet) from the center pivot to its farthest extent. 2.If the irrigation boom makes 4 full revolutions in a day, how many miles does the end of the boom travel in 4 days.

  Determine the tension in cable cd over the smooth square rod

Member ABC is supported by cable CD and a square collar at A that fits loosely over the smooth square rod. Determine the tension in cable CD. The smooth rod is fixed at its base and cannot rotate.

  Determine the magnitude of f2 which will cause the reaction

Determine the magnitude of F2 which will cause the reaction Cy at the bearing C to beequal to zero. The bearings are in proper alignment and exertonly force reactions on the rod. Set F1 = 550 lb.

  Find what depth of aggregate is needed at the angle theta

A 2000-lb wheel load is to be supported by aggregate over soil with a maximum bearing pressure of 1000 lb/sqft. What depth of aggregate is needed if the angle theta is 40 degrees

  Determine the velocity downstream of the rotor

An early NASA/DOE wind turbine consisted of a 125.0-ft diameter, two-bladed horizontal axis rotor. Maximum power was achieved at a wind speed of 19.0 miles/hr.

  Determine what velocity would be expected to parking lot

A 200 foot long, 2.5 feet in diameter, straight, corrugated metal storm drain pipe, is used to drain a parking lot. The elevation difference between the pipe ends is 8 feet. What velocity would be expected

  What is the maximum distance between the two particles

Before the second particle catches the first particle, what is the maximum distance between the two particles.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd