Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A 200 foot long, 2.5 feet in diameter, straight, corrugated metal storm drain pipe, is used to drain a parking lot. The elevation difference between the pipe ends is 8 feet. What velocity would be expected?
The block is acted by its weight W=200 lb, a horizontal force Q=600 lb, and the pressure P exerted by the inclined plane. The resultant R of these forces is up and parallel to the inclined thereby sliding the block up it. Determine P and R.
Create a MATLAB program and flowchart which will allow the user to input an unknown number of temperatures, each of which might be a temperature in Celsius, Fahrenheit, Kelvin, or Rankine, and will convert the user input temperature to each of the..
A soil sample with a water content of 14.5% and unit weight of 128.2 lb/cu. ft. was dried to a unit weight of 118.8 lb/cu. ft. without changing its void ratio. What is its new water content (in %)?
Determine the operating speeds of the machine at which the machine's steady-state amplitude is less than 0.2 mm. Take keq = 3 EI/L3.
In each experimental run, the concen tration of free available chlorine was varied and the time required to kill 99% of the organisms was determined. The results showed that a CT value of 200 min mg/L was sufficient to achieve a 2-log removal.
Should Bernard bid for the project assignment? Why or why not? Does Bernard have an unfair advantage over firms having designed the project on which he wants to bid?
Break Even Stripping Ratio (BESR), Given an underground total mining cost of $8.85 per tonne, surface mining costs of $2.95 per tonne of ore, and surface mining stripping costs of $1.75 per tonne of waste
If direct runoff hydrgraph derived from a unit hydrograph of a catchment (drainage area = 50 acre) is 120 acre-ft, back calculate the rainfall amount. Assume total abstraction in the area is 50%.
Determine the height "h" on the wall to which the firefighter can project water from the hose...and the speed of the water at the nozzle is v= 55ft/s. The firefighter is holding the hose 3.5 ft from the ground and the wall is located 15ft from the..
a mass of 2kilogram is projected with a speed of 3m/s.if a plane inclined 20 degrees with the horizontal.after travelling travelling 0.8meters, the mass comes to rest. determine the coefficient of friction and also the speed as the black returns t..
To be sure that the part does not fail, we plan to ensure that the maximum applied stress is only one third of the tensile strength. We use a non-destructive test that will detect any internal flaws greater than 1.25 mm long.
Trips can be classified by productions/attractions or origins/destinations. Which classification provides the direction of travel. Describe the product/outcome (e.g., production-attraction matrix) after each of the 4-step transportation planning pr..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd