Determine the optimal production run quantity

Assignment Help Project Management
Reference no: EM13937547

Problem 1:

The Road King Tire Company in Birmingham wants to monitor the quality of the tires it manufactures. Each day the company quality-control manager takes a sample of 100 tires, tests them, and determines the number of defective tires. The results of 20 samples have been recorded as follows:

Sample

Number of Defectives

Sample

Number of Defectives

 1

14

11

18

 2

12

12

10

 3

 9

13

19

 4

10

14

20

 5

11

15

17

 6

 7

16

18

 7

 8

17

18

 8

14

18

22

 9

16

19

24

10

17

20

23

Construct a P-chart for this process using 2σ limits and describe the variation in the process.

Problem 2:

One of the stages in the process of making denim cloth at the Southern Mills Company is to spin cotton yarn onto spindles for subsequent use in the weaving process. Occasionally the yarn breaks during the spinning process, and an operator ties it back together. Some number of breaks is considered normal; however, too many breaks might mean that the yarn is of poor quality. In order to monitor this process, the quality-control manager randomly selects a spinning machine each hour and checks the number of breaks during a 15-minute period. Following is a summary of the observations for the past 20 hours:

Sample

Number of Breaks

Sample

Number of Breaks

 1

3

11

3

 2

2

12

4

 3

4

13

6

 4

1

14

7

 5

5

15

8

 6

3

16

6

 7

2

17

5

 8

4

18

7

 9

0

19

8

10

2

20

6

Construct a c-chart using 3σ limits for this process and indicate if the process was out of control at any time.

Problem 3:

The Ambrosia Bakery makes cakes for freezing and subsequent sale. The bakery, which operates five days a week, 52 weeks a year, can produce cakes at the rate of 116 cakes per day. The bakery sets up the cake-production operation and produces until a predetermined number has been produced. When not producing cakes, the bakery uses its personnel and facilities for producing other bakery items. The setup cost for a production run of cakes is $700. The cost of holding frozen cakes in storage is $9 per cake per year. The annual demand for frozen cakes, which is constant over time, is 6000 cakes. Determine the following:

a. Optimal production run quantity (Q)
b. Total annual inventory costs
c. Optimal number of production runs per year
d. Optimal cycle time (time between run starts)
e. Run length in working days.

Problem 4:

Southwood Furniture Company is a U.S.-based furniture manufacturer that offshored all of its actual manufacturing operations to China about a decade ago. It set up a distribution center in Hong Kong from which the company ships its items to the United States on container ships. The company learned early on that it could not rely on local Chinese freight forwarders to arrange for sufficient containers for the company's shipments, so it contracted to purchase containers from a Taiwanese manufacturer and then sell them to shipping companies at the U.S. ports the containers are shipped to. Southwood needs 715 containers each year. It costs $1200 to hold a container at its distribution center, and it costs $6000 to receive an order for the containers. Determine the optimal order size, minimum total annual inventory cost, number of annual orders, and time between orders.

Reference no: EM13937547

Questions Cloud

Calculate the holding-period returns : The following are end of the month prices for both the Standard & Poors 500 Index and Nike's Common stock. Using the data here calculate the holding-period returns, the average monthly return and the standard deviation for both the S&P 500 and Nike.
Calculate the projects internal rate of return : S. Miller is looking to expand an existing project. The expansion requires an immediate investment of $73 million. S. Miller anticipates that the project will generate one future cash flow of $200 million that will arrive at the end of year 6, and on..
Annual exchange rate volatility : Use one-period binomial model to find the value of a one-year American Put option on £ with an exercise price of $1.58/£. The current spot rate is $1.53/£. One-year forward rate is $1.52/£. One-year U.S. interest rate is 3.5%. Annual exchange rate vo..
Prepare the shareholders equity section of the balance sheet : The following account balances can be found in the general ledger of Abco Corporation at year-end. Prepare the shareholders' equity section of the balance sheet.
Determine the optimal production run quantity : Construct a P-chart for this process using 2σ limits and describe the variation in the process - construct a c-chart using 3σ limits for this process and indicate if the process was out of control at any time.
Calculate after-tax cash flow at disposal : Genetic Insights Co. purchases an asset for $16,046. This asset qualifies as a seven-year recovery asset under MACRS. The seven-year fixed depreciation percentages for years 1, 2, 3, 4, 5, and 6 are 14.29%, 24.49%, 17.49%, 12.49%, 8.93%, and 8.93%, r..
Review and analysis of the industry : Pharmaceuticals • Passenger airlines • Steel manufacturing • Mid-range clothing • Hotels (accommodation) • Fast food You are then to undertake a review and analysis of the industry with a strong emphasis on key industry evolution (stages of indust..
How many workers should this profit maximizing firm hire : The table below gives data on output for a firm in the short run. The firm is able to hire labor and its TPP is given. Compute the MPP and MRP for labor if the price of the good is fixed at $12 per unit. The firm must pay workers $40 a day. How ma..
Difference between the coupon rate and the YTM of bonds : Air Jet Best Parts, Inc. would like issue 20- years’ bonds to obtain remaining funds for the New Mexico plan. The company currently has 7.5% semiannually coupon bonds in the market that sell for $1,062 and mature in 20 years. What coupon rate should ..

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd