Determine the maximum capacity of the current production

Assignment Help Operation Management
Reference no: EM131431876

Modelling & Simulation for Operations Management Assignment case study for Witness modelling and process improvement

Drive shaft manufacture

You have been employed as a member of a production improvement task force for a Drive Shaft Manufacturing Company (DSMC). DSMC has been experiencing a severe backlog in sales orders due to antiquated machinery and poor production planning. The Company has just received an unprecedented contract to supply 450 drive shafts by the process given below. However, finances at present are tight and only £250,000 can be invested. Some of the order can be sub-contracted. Your task is to determine the maximum capacity of the current production line after the investment of the £250,000 hence how many parts must be made by the sub-contractor. The cost list of potential capital improvements is given on next page.

The current output of the line averages 180 shafts on the two 38-hour shift system.

Process:

The drive shaft manufacture starts with a bar of 0.3 metres long that is cut into three parts (blocks). The operations are as follows (one machine at each operation unless stated otherwise):

1. The bar arrives based on vendor's supply schedule in lots of 3, every 30 minutes. The bar stock buffer can hold only 10 bars.

2. In the Saw machine, the time to cut the bar into 3 blocks is 6 minutes. Blade A is replaced every 40 operation and blade B every 30 operations. Set-up time is uniformly distributed between 10 and 15 minutes. Time between failures is NEGEXP with mean of 100, and the repair time follows triangular distribution with min 10, mode 25 and max 30. An operator is required to run this machine.

3. After sawing the blocks go to a Fixed conveyor with index time = 0.25 min, length 20 parts.

4. Once sawed the blocks must be coated for protection. The Coating machine takes 6 parts per cycle and has a cycle time of 60 minutes. Every 10 cycles, the machine is set-up for 5 minutes.

5. Once coated, the blocks are placed in a staging buffer of capacity 10 part, adjacent to the Inspector.

6. The Inspector draws from the staging area one block at a time and checks the quality of the block's coating. The cycle time = 20 min, set-up = 1min per part. If the coating is bad, the Inspector puts the rejected block into a Rework buffer of capacity 10. The reject rate is 20%, and rejects are returned to be recoated.

7. Parts are cured on an individual basis on a chain conveyor (Hardener) of capacity 10 parts through a furnace, a process on a first in first out basis. Heat-treat time is 60 min.

8. The hardened parts go for Gear cutting: cycle time 2 minutes + 1 minute load and unload that is manual, 2 machines, tool change every 100 parts for 10 minutes. Breakdowns mean time to failure 5000 minutes NegExp, repair time normal mean 80 minutes σ = 10. One operator runs two machines and changes cutter.

9. Four parts are Loaded into a special fixture in 4 minutes before entering for grinding; 10 fixtures are available in the system and are stored in a Fixture buffer if not used.

10. The 4 parts and the fixture are loaded to the Grinders (2 machines): cycle times M/c 1 = 35 min, M/c 2 = 40 min; Time between failures is normal distribution with mean = 75 min, SD = 15. The repair time is NEGEXP of mean 15 min and is repaired by the Saw operator.

11. Once ground, the fixture is Unloaded in 4 minutes. The fixture returns to the Fixture buffer and the parts go to two buffers of capacity 10 parts each.

12. The parts are then cleaned in the Wash machine, a multi stage machine with 5 stations, 1 part per station, cycle time = 15. Time between failures NEGEXP of mean 120 min, the repair follows Erlang distribution with mean = 20 min, K = 3. The machine is set-up every 100 operations, time 5 min. Set-up and repair are carried out by the Saw operator.

13. The Plating process follows and takes 36 parts per cycle, cycle time 36 minutes, buffers on machine 72 parts both before and after process. Due to chemical change on Monday morning, 4 hours are lost. An operator is required.

14. The parts are then washed with a Wash machine identical to 12.

15. The finished parts are Packed in Pack cycle time of 1.25 min. Packed into flat pack boxes one drive shaft per box. Boxes arrive in batches of 1000, frequency of deliveries to be determined by model. One operator required.

16. The boxes are finally shipped.

Attachment:- Assignment File.rar

Reference no: EM131431876

Questions Cloud

Describe the promotional pricing strategies : Read the short HBR article - The "Maximize Profits" Trap in Decision Making and Describe the promotional pricing strategy(ies) that are most appropriate for your GOMC Client: TONY TEJAS SALSA
Do you agree with fasb that the direct method is preferred : What are the differences between the indirect and direct methods of preparing the statement of cash flows? Do you agree with the FASB that the direct method is preferred? Why, or why not?
Explain what the cash flow ratios indicate about the company : Demonstrate your calculations in your post, and explain what the cash flow ratios indicate about the company. Do not choose a company previously chosen by one of your classmates.
What are the advantages of the twenty-year mortgages : You must now choose between a 20-year mortgage and a 30-year mortgage. What are the advantages and disadvantages of the 30-year and the 20-year mortgages?
Determine the maximum capacity of the current production : MOD002610 Modelling & Simulation for Operations Management Assignment case study for Witness modelling and process improvement. Your task is to determine the maximum capacity of the current production line after the investment of the £250,000 hence..
What does the standard error indicate : What does the standard error indicate about how accurate the sample standard deviation is as an estimate of the population standard deviation?
Briefly discuss the types of ethical issues : Briefly discuss the types of ethical issues involved in computerized accounting information systems and how organizations can encourage their employees to act ethically.
What is the exact sampling distribution of the sample mean : Write a careful description comparing the three bootstrap distributions and also comparing them with the exact sampling distribution. What are the effects of increasing the sample size?
How non normality of population affect bootstrap : Explain what you have observed based on what you know about the sampling distribution of x‾ and the way in which bootstrap distributions mimic the sampling distribution.

Reviews

len1431876

3/18/2017 3:51:11 AM

Hello, would you be able to do this assignment? This assignment has to be done in Witness Horizon 10 software. Note: Please present the process in a pseudo format before building the model in Witness.

Write a Review

Operation Management Questions & Answers

  Determining how much to save for retirement

A recent MBA would like your assistance in determining how much to save for retirement. He is planning to invest $ 3,000 in a tax- sheltered retirement fund at the end of each year (i.e., appreciation of the fund is not taxed). In the base case, assu..

  Vision statement is effective or ineffective

Debate: Debate: Clearly explain why the selected Vision Statement is effective or ineffective. GM’s vision is to be the world leader in transportation products and related services. We will earn our customers’ enthusiasm through continuous improvemen..

  Predict the major cultural paradoxes

If you were hired as the manager in Malaysia, predict the major cultural paradoxes that you would face, and suggest the key actions that you could take in order to prepare for such paradoxes.

  Recruiting-retention-compensation and benefits management

What does the high cost of replacing an international manager suggests regarding staffing philosophies i.e. recruiting, retention, compensation/benefits management, training and development etc. (pick two and discuss)? Do you think “thinking globally..

  Choosing between valued promotion in the organization

__________ is the tendency in negotiations to stake out your position based on the assumption that in order to gain your way, something must be subtracted from the other party's way. Choosing between a valued promotion in the organization or a desira..

  Multiple choice questions - operations management

Genichi Taguchi believes that through fiddling with production process, the item will fall within control chart limits and that's good enough to satisfy the QLF

  What are the economic and social consequences of prohibiting

What are the economic and social consequences of prohibiting the replacement of economic strikers?

  Based on anticipated enrolment

A university schedules a one-week training course based on anticipated enrolment. The variable cost is about $400 per student, laboratories, and allocated overhead for a class is $1500. If students pay $450 to enrol in the course, how large would enr..

  Corruption index and trade restrictions

The corruption perceptions index (CPI) is a comparative assessment of integrity performance for a variety of countries.

  Gained commitment to it from the management team

If you were the quality manager for a company and the employee empowerment effort had been your idea, how would you have gained commitment to it from the management team? What are some possible challenges that you might encounter when presenting your..

  Organization products from the products of competitors

Pick an industry and identify four companies in the industry that pursue one of the four main business-level strategies. Low-Cost Strategy-Driving the organization’s total costs down below the total costs of rivals. Differentiation- Distinguishing an..

  What are some problems that can arise

What are some problems that can arise when each stage of a supply chain focuses solely on its own profits when making decisions? Identify some actions that can help a retailer and manufacturer work together to expand the scope of strategic fit.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd