21.Track-Type Tractors Dozing

Determine average hourly production of a D8N/8SU (Hydraulic with tilt

cylinder) coal, an average distance of 400m down a 15% grade, using a slot dozing technique. Estimated material weight is 1600 kg/Lm3. Material density =1392 kg/Lm3. Operator is average. Job efficiency is 50 min/hr (check the notes for production curve, table for correction factors).

Uncorrected maximum production     458 Lm3/hr

 

22.Track-Type Tractors Ripping

Determine the loosening costs in the following situation: Machine D11R Tractor with No. 11 single shank ripper in coal Rip spacing 1600mm

Ripper penetration 500mm Rip distance 150m

Rip time           4.32 minutes Manoeuvre time                        0.35 minutes

 

Seismic velocity          2500 m/s (assume this is a realistic value for coal, graphs available to check).

Working rate per hour                         $ 120

What is the effect of the seismic velocity of rock on dozer ripping operations?

 

23.Motor Grader

A Motor grader will travel at an average speed of 10km/hr along a haul road to clear the shoulder for a distance of 20km on one side. It is expected that proper clearing will require three passes, and that the machine has the usual efficiency factor of 0.6. Calculate the production expected from this grader performing this task.

 

24.Dragline

Rated Capacity of a Dragline Bucket

Calculate the rated capacity of a dragline bucket, given the following information:

Height at front = 2m

 Height at rear = 2.25m

Length at top = 5.9m

Length at bottom = 5.4m

Width of front top = 3m

Width of rear top = 3m

 Width of front base = 3m

Width of rear base = 3m

Factor for capacity loss due to bucket design = 0.20

 

25.Wheel Loader

Application                  Dozer pile less than 3m high dump to hopper

Production Required Material

Density

 

232.05 metric ton per hour poorly fragmented rock

1700kg/m3

Loading is constant with a hard level surface for loader manoeuvring. Show calculations and procedure to select an appropriate loader for this task.

Reference no: EM13753808

Questions Cloud

Describe the marketing strategies and tactics : Briefly overview the marketing activities you are involved in implementing. Describe the marketing strategies and tactics your marketing activities relate to
How were marketing and non-marketing personnel briefed : How were marketing and non-marketing personnel briefed and Summaries stakeholder briefings regard ng their implementation roles
Operations and information management : Operations and Information Management Assignment: You are asked to provide a critical discussion on the implementation of lean which addresses the following questions: Is there a best way to implement lean? Are all organisations suitable for lean imp..
Determine the corrected production for the dozer : Determine the corrected production for the dozer for downhill dozing on a 5% slope, with a 50 minute working hour and an average operator as per the correction factors below.
Determine the loosening costs in the following situation : Determine the loosening costs in the following situation: Machine D11R Tractor with No. 11 single shank ripper in coal Rip spacing 1600mm
Define stripping ratio and give three examples : Define stripping ratio and give three examples of the units it may be expressed in.
Operations that are associated with surface mining : List all the major mining operations that are associated with surface mining.
Draw a plan of a typical strip mine : Draw a plan of a typical strip mine showing all operational features and equipment.
Why were oracles sought and recorded in ancient greek world : Why were oracles sought and recorded in the ancient greek world?

Reviews

Write a Review

Other Engineering Questions & Answers

  Operations that are associated with surface mining

List all the major mining operations that are associated with surface mining.

  The implementation of an integrated is solution

Design a risk matrix to show the likelihood and the impacts of the risks of the failures of the critical IS What is the role of Business Process Re-engineering in the implementation of an integrated IS solution

  Method of undertaking a point measurement traverse

Describe the method of undertaking an anemometer traverse for a mine airway and describe the two main methods of undertaking a pressure survey in a mine. What advantages and disadvantages do each method have?

  Non-linear temperature logging circuit

Design a non-linear temperature logging circuit and specify the technical specification of the resistors, capacitors etc. The components for the circuit: temperature sensor, analogue-to-digital converter, Ethernet or USB port, memory, microcontroller..

  Food nano technology and emulsion technology

Requires the completion of a written research paper on food nano technology and emulsion technology and this assignment requires students to interrogate and report a review on the topic with pictures figures and diagrms.

  What is the potential risk of euc hazards

What are Fire and Gas (F & G) detection and mitigation systems - why are F and G systems necessary

  Define stripping ratio and give three examples

Define stripping ratio and give three examples of the units it may be expressed in.

  Assignment philosophythis year there has been an attempt to

assignment philosophythis year there has been an attempt to replicate a real world aerospace engineering task. the

  Arena simulation program arena simulation programhomework

arena simulation program ltbrgthomework help gtgt question gtgt arena simulation program ltbrgtmodify the airline

  The maximum available memory address space for flash memory

the maximum available memory address space for flash memory on the mc9s12dp256b is 1m byte 1024k bytes. since the size

  Explain what advantages does mpls offer

Conduct research on traffic engineering using MPLS. List a set of goals for traffic engineering. Which of these goals can only be met with MPLS, and which are met by using existing (non-MPLS) protocols. What advantages does MPLS offer

  Solve geotechnical and hydraulic engineering problems

Demonstrate knowledge and understanding of the key engineering principles that underpin current geotechnical and environmental engineering together with potential future developments

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd