Calculate the amount of work done if the process is consider

Assignment Help Civil Engineering
Reference no: EM13564842

1.Determine the minimum height on the wall to which the firefighter can project water from the hose, so that the water strikes the wall horizontally. The speed of the water at the nozzle is Vc=48ft/s. Distance from the hose to the wall is 30ft. and vertical distance from the ground to the hose is 3ft. No angle is given.

2.A container with a plunger compresses one pound mole of an ideal gas from 1 atmospheres pressure to 10 atmospheres. Calculate the amount of work done if the process is considered to be polytropic. Assume the temperature to be 273K and the value of k for the process to be 1.4. All losses are neglected.

Reference no: EM13564842

Questions Cloud

What is the final temperature of the lead bulle : A 5 gram bullet traveling in 20 0C air at 300 m/sstrikes a flat steel plate and stops. What is the final temperature of the lead bullet
Calculate the equivalent horizontal and vertical hydraulic : What is the velocity of the blocks 5.00 after the blocks have started moving? Assume that the rope joining the two blocks in long enough so that, at this time, block A is on the frictionless surface while block B is still on the rough surface.
Evaluate the period at which it oscillates : A cart of mass 250 g is placed on africtionless horizontal air track. evaluate the period at which it oscillates
Determine the magnitudes of the velocity and acceleration : Three stock car drivers are racing around a circular bend. They are each circling the bend at different radii: r(1)=249 m , r(2)=255 m , and r(3)=261 m . At a given instant, all three are traveling at the same transverse rate of rotation, .259 rad/s ..
Calculate the amount of work done if the process is consider : A container with a plunger compresses one pound mole of an ideal gas from 1 atmospheres pressure to 10 atmospheres. Calculate the amount of work done if the process is considered to be polytropic. Assume the temperature to be 273K and the value of k ..
What average thickness must the engineer build to meet these : An engineer uses a standard technique for measuring the thickness of a clay landfill liner that has a typical standard deviation of 0.7 in. The project specifications require the liner thickness to be 36 inches or more, at least 95 percent of the tim..
Determine the size of the beam with the least cross-section : A simple beam of Douglas-Fir Larch, select grade, has a span of 18 ft with two concentrated loads of 3 kips each placed at the third points of the span. Neglecting its own weight, determine the size of the beam with the least cross-sectiona; area bas..
Calculate the depth of flow upstream of the bridge assuming : A tensile test was performed on a metal specimen having a circular cross section with a diameter of 0.50 inch. The gage length is 2 inches. For a load of 13.5 kips, the elongation was 4.66 x 10-3 inches. If the load is assumed to be within the linear..
Find which dam would need to be constructed more strongly : If a large lake is held back by a dam that is equallylong and equally deep compared to another body of water, but is anarrow river, which dam would need to be constructed more strongly

Reviews

Write a Review

Civil Engineering Questions & Answers

  What are some of the parameters that would be taken

A jet on an aircraft carrier is launched by a catapult. What are some of the parameters that would be taken into account to make sure the aircraft achives a specified speed at the end of the ship

  Analyze the cycle from 1st and 2nd thermodynamics point view

A proposed combined cycle power plant is shown below. A gas turbine engine, the topping cycle, takes air at state 1 (T=300 K, P=100 kPa) and compress it irreversibly (hc=0.87) to state 2.

  How to estimate for the loaded machines on level ground

Stripping overburden in the Illinois coal belt, the Dusty Coal Company uses 270-horsepower, track-type tractors (with direct-drive transmissions) and drawn scrapers.

  Determine the evaporation rate for a reservoir if the wind

Determine the evaporation rate for a reservoir if the wind speed is 40 mph and the surface temperature is 15 degrees Celsius and the overlaying temperature is 25 degrees Celsius. and the relative humidity is 30 percent

  What is the head loss due to friction per 1000 m of pipe

Water flows through a 250-mm diameter steel (C=120) pipe at a a velocity, V = 1.5 m/s. Using the Hazen-Williams equation, what is the head loss due to friction per 1000 m of pipe

  Determine the filtration rate if the depth of this layer

A Single clean layer of sand in a rapid-sand filter has an average grains size of 20X40 US. Mesh, porosity go 0.4, sand specific gravity of 2.65, and shape factor of 0.85. The absolute viscosity and density of water are 1.4X10^-3 Pa-s and 998 kg/m^3,..

  Determine vb of the load b after it has dropped 200 mm

A 40 kg sheave a OF RADIUS R=350 mm. and cenral radiusof gyration k=250 mm carries a 160 kg load b and is suspended by a cable and a spring of modulus k=1.2 kN/m. if the system is relased from rest in the positon show the spring is stretched 100 mm d..

  What is the average length of queue

What is the average length of queue, the average time spent in the system, and the average waiting time in the queue?

  What is the anle of internal friction for the sand

A direct shear cell 25.4cm x 25.4 cm in plan is filled with dry sand. a normal load of 6kN is applied to the sample, and the shear failure is 3.5kN. What is the anle of internal friction for the sand?

  What diameter is required if the concrete pipe is to carry

A ciricular sewer is laid on a slope of 0.5%. What diameter is required if the concrete pipe is to carry 25 cfs If the desired design mean suction velocity is between 3 and 7 ft/s, is the design acceptable

  What is time-mean speed and space-mean speed for vehicle

assume you are an observer standing at a point on the track for a period of 30 minutes and are recording the instantaneous speed of each vehicle as it crosses your point. what is the time-mean speed and space-mean speed for these vehicles for this..

  How high can the hump be made without backing flow up

A smooth hump is placed in the bottom of the channel. What would be the depth of flow over a 3 ft high jump. How high can the hump be made without backing flow up What would be the depth of flow over and just upstream of a 6 ft high jump

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd