Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.OverviewAs the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company's campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.Deliverable 1: Summary (MS Word or open source equivalent)1. Write a one to two (1-2) page summary document in which you:a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).b. Define a work breakdown structure and describe the methodology behind constructing one.Deliverable 2: WBS (MS Project or open source equivalent)2. Use Microsoft Project to create a WBS which:a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.c. Contains Work Breakdown Structure Code for each task.d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.Deliverable one (1) of your assignment must follow these formatting requirements:Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
scope time and cost constraints of projecthow are the triple constraints related and how are they affected by change?
Discuss the techniques that companies are using today for estimating time and cost in their projects.
speedy racer corp. currently sells 18000 motor homes per year at 40000 each and 6000 luxury motor coaches per year at
Commodore Corporation is deciding whether it makes sense to invest in a project today, or to postpone this decision for one year.
How should a project manager or team go about managing changes to the Project Scope Document and what are the points and pitfalls that should be kept in mind?
Use GM (General Motors) as an example, explain variable, fixed, average, marginal, and total cost of production.
Lauren Moore has sold her business for $500,000 and wants to invest in condominium units (which she intends to rent) and land (which she will lease to a farmer).
Competitive risks and technical risks are components of which of the four risk categories associated with every project?
expatriate manager1. would you recommend hiring a local manager over an expatriate manager? why? does the phase of the
project life cycle modelafter the pre-project feasibility phase the telecommunications project lifecycle model
cost of production report using fifoequivalent productionbangor products manufactures electronics language translators.
There is a lot of talk about the process for developing cost estimates but the schedule process is not as well defined.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd