Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
In a large university computing center, on average there are 10 service calls per day. A computer technician can handle on average 5 service calls per day. The cost of adding a technician (C1) is $200 per day and the estimated cost of waiting per incident (C2) is $250 per day. Find: (a) the optimum number if technicians needed in order to minimize the expected total cost, and (b) the average time a computer will remain down. (Avg time spent in the system)
Consider the rocket on a test stand . The nose of the rocket is fixed. The rocket is of length L, constant EA and constant m, mass per unit length. To investigate longitudinal dynamics, the rocket is modeled using axial elements of equal length.
If the channel is overtopped for 2 years in a row, renovation cost will increase too much. What is the probability that the channel will be overtopped for only 2 years in a row in a 4 year period
An effluent holding pond to be used as part of a spray irrigations system is being built. The holding pond is located 2.5 miles awary for the 10 mgd WWTP which will supply the effluent
If a sample for BOD needs to be diluted by a factor of 0.02 , calculate the volume of sample that will be used in the BOD bottle
A ball is dropped from a boat so that it strikes the surface of a lake with a speed of 19.5ft/s. While in the water the ball experiences an acceleration of a = 10 - 0.8v, where a and v are expressed in ft/s^2 and ft/s, respectively
The cylinder has a length of 120 cm and a diameter of 12 cm. The field sample with a porosity of 0.24 is tested under a constant head difference of 160 cm with water at 10 degree Celcius.
The air pressure is 120 KPa, the air temperatuer is 28 degrees C, and the dew point is 20 degrees C. Calculate the corresponding vapor pressure (ea) and relative humidity (RH). Assume Atmospheric pressure is 101,000 Pa.
Determine the (a) the coefficient of statics friction between the hawser and the bollard. (b) the number of times the hawser should be wrapped around the bollard if a 20000 pound force is to be resisted by the same 80 pound force
An engineer in a developing country observes that his project bankaccount has grown from 1,600,000 to 1,769,279 (local currencyunits) in 20 days with no deposits or withdrawals being made. He knows the account interest is compounded daily.
A pole is held vertically on a soil surface by three equally spaced wires tied to the top of the pole. Each wire has a tension of 1 kN and is inclined at 45 degrees to the vertical.
A distance of 200 ft must be taped in a manner to ensure a standard deviation smaller than ± 0.03 ft. What must be the standard deviation per 100 ft tape length to achieve the desired precision?
A line is measured with a 2-chain tape, and a suveyors arrows are use to mark the end of the tape lengths . the three tallies are recorde the rear tapeman has eight arrows
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd