Workshop drawings, Civil Engineering

Assignment Help:

Workshop Drawings 

(Contractor Scope)

1. Air Conditioning and Ventilation Systems:

Builder work drawings

Enlarged scale double line HVAC System Duct & piping layouts with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

2. Piping Systems:

2.1 Potable Water, Steam, and Hot Water Systems

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.3 Sanitary and Rainwater

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.4 Compressed Air

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagram

2.5 Process Chilled Water, Cooling Water, Brine, Glycol water, Ice water

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.6 Technical Gases

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.7 Irrigation

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings

2.8 Fire Fighting

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

3. Electrical Systems:

3.1 Electric Substation

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, medium voltage and low voltage switch gear, cables, cable trays, lighting fixtures, power sockets  and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

3.2 Independent power supply (UPS)

Enlarged scale workshop drawings with wires, conduits, back boxes, cables, cable trays, data sockets, security systems outlets (if applied), notes, symbols, abbreviations, submittals, materials 

Detailed installation drawings

3.3 Power and Lighting Plans

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, cables, cable trays, lighting fixtures, power sockets and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule 

Detailed installation drawings


Related Discussions:- Workshop drawings

Warm mix asphalt., how it different from hot mix asphalt . is it changes an...

how it different from hot mix asphalt . is it changes any performance compared to hot mix asphalt

Univariate normal distribution, Univariate normal distribution: Let X ...

Univariate normal distribution: Let X = (X I , X 2 , ..., X n ,) has the multivariate normal distribution (5.26) of Section 5.4. Show that Y = a X ' follows a univariate norma

How double drainage occur, The loading period for a building extended from ...

The loading period for a building extended from Feb., 1957 to Feb., 1959. In Feb., 1962, the average measured settlement was found to be 117 mm. The ultimate settlement was expecte

Define surface water treatment rule (swtr), Define Surface Water Treatment ...

Define Surface Water Treatment Rule (SWTR) SWTR sets forth primary drinking water regulations requiring treatment of surface water supplies or groundwater supplies under the di

Is codes for building materials and construction, IS CODES FOR BUILDING MAT...

IS CODES FOR BUILDING MATERIALS AND CONSTRUCTION The following is the list of some of the IS code giving requirements for building materials: IS 269-1989. Specification for ord

What is immediate settlement, Q. What is Immediate Settlement? Strain i...

Q. What is Immediate Settlement? Strain in all coarse grained, dry or partly saturated fine grained soils occur immediately after the application of stress. Hence, this change

Rebound hammer.., rebound hammer working mechanism with detailed specificat...

rebound hammer working mechanism with detailed specifications of the images

Mapping, how to understand maps easily?

how to understand maps easily?

Write Your Message!

Captcha
Free Assignment Quote