Workshop drawings, Civil Engineering

Assignment Help:

Workshop Drawings 

(Contractor Scope)

1. Air Conditioning and Ventilation Systems:

Builder work drawings

Enlarged scale double line HVAC System Duct & piping layouts with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

2. Piping Systems:

2.1 Potable Water, Steam, and Hot Water Systems

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.3 Sanitary and Rainwater

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.4 Compressed Air

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagram

2.5 Process Chilled Water, Cooling Water, Brine, Glycol water, Ice water

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.6 Technical Gases

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.7 Irrigation

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings

2.8 Fire Fighting

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

3. Electrical Systems:

3.1 Electric Substation

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, medium voltage and low voltage switch gear, cables, cable trays, lighting fixtures, power sockets  and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

3.2 Independent power supply (UPS)

Enlarged scale workshop drawings with wires, conduits, back boxes, cables, cable trays, data sockets, security systems outlets (if applied), notes, symbols, abbreviations, submittals, materials 

Detailed installation drawings

3.3 Power and Lighting Plans

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, cables, cable trays, lighting fixtures, power sockets and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule 

Detailed installation drawings


Related Discussions:- Workshop drawings

#title., what is the cause of scale and sludge formation and its diadvantag...

what is the cause of scale and sludge formation and its diadvantages

Equllibrium, how to know about he sign convention for equllibrium forces

how to know about he sign convention for equllibrium forces

Calculate snow weight, Snow weight In spatial trusses, Snow load is muc...

Snow weight In spatial trusses, Snow load is much more important than building. As in buildings snow load is only a small proportion of the overall weight of the building, it w

Use of PFA and GGBS, Q. Use of PFA and GGBS? Both PFA and GGBS are by-p...

Q. Use of PFA and GGBS? Both PFA and GGBS are by-products of industry and use of them is ecologically friendly. Most significantly, with PFA and GBS adopted as partial replacem

Project management, planking and strutting for shallow excavation

planking and strutting for shallow excavation

HIGHWAY CONSTRUCTION & MAINTENANCE, what is the difference between feasibil...

what is the difference between feasibility study and traffic counting

Bearing, difination of magnative bearing

difination of magnative bearing

Explain the components of a rebound hammer, Explain the Components of a reb...

Explain the Components of a rebound Hammer? Several components of a rebound hammer are displayed in below Figure. 1. Concrete surface; 2. Impact spring; 3. Rider on gui

#title beam design, how to calculate loads acting on a simple supported bea...

how to calculate loads acting on a simple supported beam of 220width by 425 depth #Minimum 100 words accepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd