Workshop drawings, Civil Engineering

Assignment Help:

Workshop Drawings 

(Contractor Scope)

1. Air Conditioning and Ventilation Systems:

Builder work drawings

Enlarged scale double line HVAC System Duct & piping layouts with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

2. Piping Systems:

2.1 Potable Water, Steam, and Hot Water Systems

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.3 Sanitary and Rainwater

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.4 Compressed Air

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagram

2.5 Process Chilled Water, Cooling Water, Brine, Glycol water, Ice water

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.6 Technical Gases

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.7 Irrigation

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings

2.8 Fire Fighting

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

3. Electrical Systems:

3.1 Electric Substation

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, medium voltage and low voltage switch gear, cables, cable trays, lighting fixtures, power sockets  and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

3.2 Independent power supply (UPS)

Enlarged scale workshop drawings with wires, conduits, back boxes, cables, cable trays, data sockets, security systems outlets (if applied), notes, symbols, abbreviations, submittals, materials 

Detailed installation drawings

3.3 Power and Lighting Plans

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, cables, cable trays, lighting fixtures, power sockets and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule 

Detailed installation drawings


Related Discussions:- Workshop drawings

Constructed wetland design guidelines, Develop a simple urban constructed w...

Develop a simple urban constructed wetland design guidelines and drawings. Your report should include the following: I. Data required for the design II. Types of constructed

Harbour, what is entrance channel in harbour?

what is entrance channel in harbour?

Explain the design criteria for sedimentation basin, Explain the Design Cri...

Explain the Design Criteria Sedimentation basin Surface Loading rate (or overflow rate), Vo = Q/A (flow rate/surface area) Detention time t or ? = V/Q (Volume /Flow rate)

Explain about the hydrogen embrittlement, Explain about the Hydrogen Embrit...

Explain about the Hydrogen Embrittlement As a result of the action of acids on high-tensile steels, liberation of hydrogen takes place. It penetrates into the steel surface an

Hybridisation, Why hybridisation never take in isolated atom

Why hybridisation never take in isolated atom

Environment engineering assignment, Estimate the ground level NO concentrat...

Estimate the ground level NO concentration: a. Directly downwind at a distance of 2 km b. At the point downwind where NO is maximum c. At a point located 2 km downwind and 0.1 km

Most aggregate size advantage structures, Question Design of concrete struc...

Question Design of concrete structures, normally most aggregate sizes are adopted with scopes from 10mm to 20mm. Does an increase of most aggregate size advantage structures ?

Shoes of prefabricated drains, Q. Shoes of prefabricated drains? Shoes ...

Q. Shoes of prefabricated drains? Shoes are generally installed in prefabricated drains for the below : (i)  It avoids the entry of soils in the mandrel by sealing it at the

Show the continuous piezocone penetration test, Q. Show the Continuous Piez...

Q. Show the Continuous Piezocone Penetration Test? Continuous piezocone penetration test essentiallycomprises standard cone penetration test and a measurement of pore water pre

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd