Workshop Drawings 

(Contractor Scope)

1. Air Conditioning and Ventilation Systems:

Builder work drawings

Enlarged scale double line HVAC System Duct & piping layouts with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

2. Piping Systems:

2.1 Potable Water, Steam, and Hot Water Systems

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.3 Sanitary and Rainwater

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.4 Compressed Air

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagram

2.5 Process Chilled Water, Cooling Water, Brine, Glycol water, Ice water

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.6 Technical Gases

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.7 Irrigation

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings

2.8 Fire Fighting

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

3. Electrical Systems:

3.1 Electric Substation

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, medium voltage and low voltage switch gear, cables, cable trays, lighting fixtures, power sockets  and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

3.2 Independent power supply (UPS)

Enlarged scale workshop drawings with wires, conduits, back boxes, cables, cable trays, data sockets, security systems outlets (if applied), notes, symbols, abbreviations, submittals, materials 

Detailed installation drawings

3.3 Power and Lighting Plans

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, cables, cable trays, lighting fixtures, power sockets and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule 

Detailed installation drawings


Related Discussions:- Workshop drawings

Find out load carrying capacity, Q.for ISMB200 having 6.70 m span simply su...

Q.for ISMB200 having 6.70 m span simply supported so find out load carrying capacity.

Transportation Engineering, can u help with assignment and how much per ass...

can u help with assignment and how much per assignment

Low cost roads connecting villages, Low Cost Roads Connecting Villages: ...

Low Cost Roads Connecting Villages: Problem of Village Connectivity It is estimated that nearly 45 per cent of India's villages are not connected by an all-weather ro

Necessity for road drainage - road drainage, Necessity for Road Drainage: ...

Necessity for Road Drainage: Poor drainage can cause damage to the various components of a road in the following manner: (a) Water can enter the various pavement layers th

Segmentally lined and sprayed concrete linings tunnels, Q. Segmentally line...

Q. Segmentally lined and Sprayed Concrete Linings tunnels? The fundamental difference between segmentally lined tunnels and SCL tunnels is that the sprayed concrete in SCL tunn

What is specific energy - hydrologic system, What is Specific Energy Ap...

What is Specific Energy Applying the Bernoulli energy equation in open channel flow results in Z = 0 (channel bottom or datum), the pressure head (p/γ) = d, and the velocity he

Define the types of pump performance curves, Define the types of Pump Perfo...

Define the types of Pump Performance Curves Two types of pump performance curves: x-axis = flow rate; y-axis = head (TDH). Characteristic curves: Provided by the pump m

Surveying, length of the line measured with 20m chain found to be 250m.calc...

length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd