Workshop drawings, Civil Engineering

Assignment Help:

Workshop Drawings 

(Contractor Scope)

1. Air Conditioning and Ventilation Systems:

Builder work drawings

Enlarged scale double line HVAC System Duct & piping layouts with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

2. Piping Systems:

2.1 Potable Water, Steam, and Hot Water Systems

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.3 Sanitary and Rainwater

Builder work drawings 

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagrams

2.4 Compressed Air

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

Isometric single line diagram

2.5 Process Chilled Water, Cooling Water, Brine, Glycol water, Ice water

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.6 Technical Gases

Builder work drawings

Enlarged scale double line workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

2.7 Irrigation

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings

2.8 Fire Fighting

Builder work drawings

Enlarged scale workshop drawings with sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Sectional details complete as  in above 

Detailed installation drawings as per manufacturer recommendations

3. Electrical Systems:

3.1 Electric Substation

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, medium voltage and low voltage switch gear, cables, cable trays, lighting fixtures, power sockets  and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule. 

Detailed installation drawings

3.2 Independent power supply (UPS)

Enlarged scale workshop drawings with wires, conduits, back boxes, cables, cable trays, data sockets, security systems outlets (if applied), notes, symbols, abbreviations, submittals, materials 

Detailed installation drawings

3.3 Power and Lighting Plans

Builder work drawings

Enlarged scale workshop drawings with wires, conduits, back boxes, bus bars, cables, cable trays, lighting fixtures, power sockets and isolator switches sizing, notes, symbols, abbreviations, hungers, supports, submittals, materials and equipments schedule 

Detailed installation drawings


Related Discussions:- Workshop drawings

What to do to improve the reliability of the test results, Explain clearly ...

Explain clearly with a neat sketch how you will verify the coefficient of permeability of a clay sample in the laboratory and derive the expression used to compute the permeability

Forensic structural engineering, i need journals or articles of forensic st...

i need journals or articles of forensic structural engineering

Concrete, types of concrete and its uses

types of concrete and its uses

Diferential equations, show that Y = 4e2x - 2e-3x is a solution of initia...

show that Y = 4e2x - 2e-3x is a solution of initial-value problem (d2y)/(dx2)+ (dy)/(dx) - 6y=0 ; y(0)=6 ; y’(0)=2 . is Y = 2e2x - 4e-3x also a solution of this proble

Derive, Derived condition of economic span of bridge

Derived condition of economic span of bridge

Shear force and bending moment, relation between shear force and bending mo...

relation between shear force and bending moment and examples based on those relationship

Differences between pipe jacking and micro-tunnelling, Q. Differences betwe...

Q. Differences between pipe jacking and micro-tunnelling? Pipe jacking is a general scheme of installation of pipes with a tunnelling shield in front and the pipes are jacked f

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd