Q. What is Issued for Approval?
This initial formal issue of the P&IDs to the Customer incorporates the process development agreed to in the approved IFD level PFDs. In addition, these P&IDs have been subjected to a full internal review. After Customer's review, a signed off set of drawings will be returned to Colt thereby indicating Customer's acceptance of project/ drawing development to this stage. Receipt of the Customer-approved IFA drawings will permit disciplines to proceed with engineering up to commencement of detailed design.
Using Bode plot calculate (a) Phase margin (b) Gain margin (c) Stability of closed loop system. The open transfer function of the system is
how we can do root sheet of hammer?
Classification Based on Type of Welding Fusion welding : These processes involve fusion of the base metal to complete the weld. Fusion welds generally do not require thea
Keywords related to Air transportation: Airfield/Airport : The area which contains the facilities needed for the operation of aircraft. Apron
General Phase of Value Engineering: Steps- 1. Prepare a strong foundation for the value study. Extension of auger in screw conveyer in hydraulic paver machine is to be do
Determine the percentage savings in the material: A hollow shaft containing an inside diameter 0.5 times the outer diameter is to replace the solid shaft of the similar materi
A compound cylinder is made by shrinkage one cylinder of 120 mm external diameter and 20 mm wall thickness. The shrinkage allowance , based on radius , is 0.025 mm. If both cylinde
Determine the economic order quantity: Determine the economic order quantity and the reorder point. Given Annual demand (D) = 2,000 units Average daily demand (d) = 2,00
Ensure all low points on steam mains and equipment have drip trap assembly. High pressure condensate to be taken to flash tanks, provide detail of flash tank. Use minimum 24" (610
Temporary Stone Scuppers: In hill roads, it is customary to cut the roads from the hill-face and to open up the road immediately thereafter to traffic. Further improvements s
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd