What is chamfering of rail, Civil Engineering

Assignment Help:

Q. What is Chamfering of rail?

Chamfering of rail holes has been done for the life of rail hole is increased and chances of the rail hole developing any crack is eliminated.

To operate the equipment chamfering bits are fixed on either side of the hole of the rail with the help of bolt and packing pieces. The torque is set on the torque wrench to a valve of 370 Lbs ft for 52 kg rails. The nut is then tightened progressively till the designed torque is reached and the torque wrench slips. The nut bolt arrangement is then unscrewed and the equipment is back in normal position.

The manufacturer claim that time taken for chamfering the hole is only about 1½ minute.


Related Discussions:- What is chamfering of rail

Estimation of discharge, Estimation of Discharge: The estimation of d...

Estimation of Discharge: The estimation of discharge of a stream is necessary for determining the waterway, clearance and foundation details. Discharge is estimated from :

Define categories of spalls -underwater inspection of bridge, Define catego...

Define categories of Spalls -underwater inspection of bridge? Spalls are classified as follows:  i. Small spalls - up to 25 mm deep or approximately 150 mm in diameter. i

Construction equipments, what is preventive maintenance and state its advan...

what is preventive maintenance and state its advantages

#title.long span truss design, what are the step by step process of designi...

what are the step by step process of designing steel long span trusses?

Phyisc, describe abot the michelson interfrance

describe abot the michelson interfrance

Determine the stresses set up in the brass, Determine the stresses set up i...

Determine the stresses set up in the brass: A compound bar is constructed from three bars 50 mm wide by 12 mm thick fastened together to form a bar 50 mm wide by 36 mm thick.

Rainfall-runoff computation, hi sir. i hope every thing is fine with you. I...

hi sir. i hope every thing is fine with you. I want to have an information about the way how to compute stream flow from the rainfall over the catchment and anso need the way how t

Describe general shear failure, Describe 'general shear failure' and 'Local...

Describe 'general shear failure' and 'Local shear failure'. Differentiate among (i)   Shallow foundation and deep foundation, (ii)  Gross and net bearing capacity, (iii) S

Calculate time taken for consolidation in actual layer, A clay layer 5 m th...

A clay layer 5 m thick has double drainage. It was consolidated under a load of 127.5 kN/m2. The load is enhanced to 197.5 kN/m 2 . The coefficient of volume compressibility is 5.7

Define pneumatic tools for underwater inspection of bridge, Define Pneumati...

Define Pneumatic Tools for Underwater Inspection of Bridge? These are more efficient than hand tools and cause less diver fatigue. The disadvantages are that below about 20 m,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd