Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. What is Chamfering of rail?
Chamfering of rail holes has been done for the life of rail hole is increased and chances of the rail hole developing any crack is eliminated.
To operate the equipment chamfering bits are fixed on either side of the hole of the rail with the help of bolt and packing pieces. The torque is set on the torque wrench to a valve of 370 Lbs ft for 52 kg rails. The nut is then tightened progressively till the designed torque is reached and the torque wrench slips. The nut bolt arrangement is then unscrewed and the equipment is back in normal position.
The manufacturer claim that time taken for chamfering the hole is only about 1½ minute.
A wood pile of 10 m length is driven by a 1500 kg drop hammer falling by 3 m to a final set equal to 1.25 cm per blow. Measure the safe load on the pile using the Engineering Ne
Question For fixing of silt curtains, what is the reason that it does not desirable to design the curtain to touch the seabed ? Answer Silt finished are resistant ve
Q. Inspection and Quality Control Certificate : A 'lot' under inspection should be accepted by the inspector when no defect is found in the acceptance level tests and so certif
calculate the support reaction as shown in figure;
Q. Why does pipe jacking machine usually get stuck when the ground condition change from soil to very hard rock? When pipejacking machine moves from anarea of soil to very hard
Q. Mechanism of plastic settlement in fresh concrete? Within a few hours after placing of fresh concrete, plastic concrete can experience cracking due to occurrence of plastic
Q. Paint system to protect steelwork from corrosion? In a typical painting system, there are generally three main layers primer, undercoat and finishing coat. Primer acts as th
Question In case of for unreinforced concrete carriageway, what will succession of closing and opening of expansion joints and contraction joints? Answer Take a case t
Immersed tube method for underwater crossing includes the following basic construction steps: (i) Prefabricating long tunnel units (concrete orsteel shell) in a dry-dock or shi
Could someone please help me understand the basics of bridge designing
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd