(i) Busy Hour

(ii) Peak Busy Hour

(iv) Time consistent Busy Hour 

(v) Traffic intensity

Ans:

(i)  Busy Hour:Continuous 1-hour period lying wholly in time interval concerned for which traffic volume or number of calls attempts is greatest.

(ii) Peak Busy Hour: Busy hour each day; it usually varies from day to day or even a number of days.

(iii) Time consistent Busy Hour:1-hour period starting at the same time each day for that average traffic volume or number of call attempts is greatest over the days under consideration.

(iv)Traffic intensity:Traffic on the network may then be measured in terms of occupancy of the servers in the network. Such a measure is known as traffic intensity.It is defined as:

 A0 = Period for which a server is occupied / Total period of observation


Related Discussions:- What do you mean by time consistent busy hour

Condition return, Condition Return Similar to conditional jump and cal...

Condition Return Similar to conditional jump and call  instructions there are conditional return  instructions  also  based on various  flags.

Beem, Ballistic galvanometer

Ballistic galvanometer

What is effect of overheating on an electric insulator, What is the effect ...

What is the effect of overheating on the life of an electric insulator? An insulator is designed to withstand amount of heat. However, when an insulator is overheated so dielec

Explain about the typical embedded system hardware unit, Explain about the ...

Explain about the typical embedded system hardware unit. Typical Embedded System Hardware Unit: Program Flow and data path Control Unit (CU): comprises a fetch unit for fetc

Explain antiferromagnetism magnetic materials, Explain Antiferromagnetism m...

Explain Antiferromagnetism magnetic materials. Antiferromagnetism : Magnetic dipoles are aligned anti-parallel to each other. Antiferromagnetic type materials are not as famil

Strategy and customer relationship management, Strategy and Customer Relati...

Strategy and Customer Relationship Management CRM sometimes considers as only information technology because of availability of quite a good number of software packages in the

Determine the system active power, A three-phase, 4160 V, 60 Hz, 3000 kVA g...

A three-phase, 4160 V, 60 Hz, 3000 kVA generator supplies the following three phase loads:  A 00 kVA at .7 pf lagging, D 00 kVA at .9 pf lagging, and C 50 kVA at unity pf.

Gis applications in management of power distribution systems, GIS Applicati...

GIS Applications in Management of Power Distribution Systems: a.)        Inventory of existing network. b.)        Easy access to network details. c.)        Easy access

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd