Q. What do you mean by River Gauging?

Due to certain behavior of rivers the problem of gauging then is quit complex. The purpose of river gauging is to stabilize the river channel along a certain alignment with a certain cross section. In most part where the rainfall is concentrated in monsoon period lasting for about 3 months in a year, the river discharge in high floods may very from 50 to 100 times that of normal. All the Changes in river cross section and course take place of high stage of flow. The main object of river gauging is -

i. To prevent the river from changing its course.

ii. To prevent flooding of surrounding area.

iii. To provide protection to the approach embankments.

iv. To provide minimum depth of flow and a good course for navigation purposes.


Related Discussions:- What do you mean by river gauging

Manufacturing technique of ferro cement, what are the manufacturing techniq...

what are the manufacturing techniques of ferro cement?

What are some facts about concrete, Actually, drying is not directly linked...

Actually, drying is not directly linked to hardness in concrete. After concrete is poured, putting it in a wet environment by spraying it constantly with water will hasten its hard

What is a projection line, Projection line is the way, in which the earth i...

Projection line is the way, in which the earth is made known on a flat piece of paper.

Pure bending, What are the assumptions made in the theory of pure bending

What are the assumptions made in the theory of pure bending

In marine pile type of steel tubular piles, Question In marine pile typ...

Question In marine pile type of steel tubular piles with reinforced concrete infill, least toe level is frequently specified in contract drawings. What is the purpose in your v

Explain in brief about the term - anchorage, Explain brief about the term -...

Explain brief about the term - Anchorage A device used to anchor tendons at the end of a concrete member is called as an anchorage in the case of post-tensioned concrete. In th

Measure the safe load on the pile, A wood pile of 10 m length is driven by ...

A wood pile of 10 m length is driven by a 1500 kg drop hammer falling by 3 m to a final set equal to 1.25 cm per blow. Measure the safe load on the pile using the Engineering Ne

Shear stress, shear stress numerical of T section & I section to find maxim...

shear stress numerical of T section & I section to find maximum shear stress

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd