What do you mean by river gauging, Civil Engineering

Assignment Help:

Q. What do you mean by River Gauging?

Due to certain behavior of rivers the problem of gauging then is quit complex. The purpose of river gauging is to stabilize the river channel along a certain alignment with a certain cross section. In most part where the rainfall is concentrated in monsoon period lasting for about 3 months in a year, the river discharge in high floods may very from 50 to 100 times that of normal. All the Changes in river cross section and course take place of high stage of flow. The main object of river gauging is -

i. To prevent the river from changing its course.

ii. To prevent flooding of surrounding area.

iii. To provide protection to the approach embankments.

iv. To provide minimum depth of flow and a good course for navigation purposes.


Related Discussions:- What do you mean by river gauging

Acidity and alkalinity - chemical characteristics of water, Acidity and Alk...

Acidity and Alkalinity - Chemical Characteristics of Water Acidity: Capacity to neutralize bases and is a measure of acids in water. Acidity is measured by titrating the s

Skid resistance of wearing course, Skid resistance of wearing course S...

Skid resistance of wearing course Skid resistance of wearing course in a bituminous pavement is contributed by macro texture (which implies the general surface roughness) and

M, symbols of electrical layout

symbols of electrical layout

Surveying, describe the two fundermental purposes of surveying

describe the two fundermental purposes of surveying

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

What will be the increase in horizontal thrust, A 9 metre high retaining wa...

A 9 metre high retaining wall retains a soil with the following properties: φ = 36°; γ = 18 kN/m 3 . What will be the enhance in horizontal thrust if the soil slopes up from the

PORTAL FRAME, EXPLAIN SITUATION OF THE PORTAL FRAME CAN CAUSE SWAY WITH THE...

EXPLAIN SITUATION OF THE PORTAL FRAME CAN CAUSE SWAY WITH THE AID OF A DIGRAM

Inspection and testing, Q. Inspection and testing ? The inspection and ...

Q. Inspection and testing ? The inspection and tests on elastomer and the finished bearings are very important aspects of ensuring a satisfactory performance of the bearing. IR

Installation of band drains, Question For drained reclamation, what wil...

Question For drained reclamation, what will significance of smear zone bring by installation of band drains ? Answer Throughout installation of band drains, smear zon

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd