Pattern of load distribution of piles in such agreement, Civil Engineering

Assignment Help:

Question

For a rigid pile cap with vertical piles at middle and raking piles at the sides, what is pattern of load distribution of piles in such agreement?


Answer

Because of effect of interaction of individual piles, central piles tend to settle additional than edge piles while pile cap is under a uniform load. Then, raking piles at edge take up a higher fraction of total loads and are theme to higher axial and pliant loads in case pile cap is stiff. In extreme case, failure of these raking edge piles could happen.

 


Related Discussions:- Pattern of load distribution of piles in such agreement

Calculate the amount of waste, Calculate the Amount of Waste A municipa...

Calculate the Amount of Waste A municipal solid waste department plans to separate a portion of the ferrous metal, newsprint and cardboard from its MSW waste stream. The depart

Maintenance of drainage and shoulders, Maintenance of Drainage: Maint...

Maintenance of Drainage: Maintenance of drainage will ensure that the run-off is taken away from the runway efficiently. The side ditches and buried pipes should be cleaned r

Cumulative distribution function - poisson distribution, Cumulative distrib...

Cumulative distribution function - Poisson distribution: Find the cdf of Y = X 1 , + X 2 where X I and X 2 independently follow Poisson distribution with parameters λ l an

Chain surveying, Chain Surveying: In the chain surveying, you have stu...

Chain Surveying: In the chain surveying, you have studied the basics of chain surveying. In chain surveying, various equipment and instruments are used for measuring distances

Cone, if the diameter of the base remains constant by what factor should th...

if the diameter of the base remains constant by what factor should the altitude be multiplied to produce a cone with twice volume as the original

What is dead weight, Dead weight Dead loads are the weight of perma...

Dead weight Dead loads are the weight of permanent components of the structures such as the weight of the elements and spheres, casing weight, weight of the false ceiling a

Determine the project duration and critical path, Critical Path - Activity ...

Critical Path - Activity on Node The project precedence table shown below provides the relationships and durations of all activities. Based on end-of-day calculations for start

Levelling, how to establish temporary benchmark

how to establish temporary benchmark

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd