Q. What do you mean by Plain elastomeric pads?
Plain pads are used for light or moderate loadings. Plain pads have a tendency to bulge under heavy loadings. In order to reduce the tendency of bulging, the elastomer pads are reinforced with steel plates. The steel sheets separating the layers of elastomer are completely encased within the elastomeric material. For vertical load, each layer of elastomer behaves like an individual pad, while horizontal strain on each layer is additive. Therefore, adding steel laminations is a convient way to accommodate larger lateral movements for the same compressive loads. Fibre reinforced pads are usually reinforced with fibre glass.
Describe municipal water treatment?
This is more likely in to Aerospace engineering.. So if there's anyone whose doing his/her major or have any skills regarding that field please help me with this problem. :) a)
i want to know how bending stress distribution in c section
what are the factors which influence the efficiency of the turbine?
Features of a Stratigraphical Survey phase The principal features of a Stratigraphical Survey phase are: a) Determination of depth of ground water, thickness, extent and ap
Explain the Confined Aquifer and Piezometric Surface Confined Aquifer Groundwater is confined by impervious geologic stratums on all sides. The water may be under pressure.
definition of youngs modulus
The liquid limit and plastic limit of clay are 100% and 25%, respectively. From a hydrometer analysis it has been found that the clay soil having of 50% of particles smaller than 0
Calculate the principal stresses for the state of stress: Calculate the principal stresses and principal planes for the state of stress shown in Figure. Figure
A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd