Question
While pipe jacking or microtunneling, it is usually accepted that cover depths of jacking pipes cannot be also shallow as in less than 2D where D is the diameter of jacking pipes.Give some key reasons?
Answer
For pipe jacking or microtunneling, reasons of large settlement are defeat of face constancy, failure to even out ground around shafts, presence of annular gap around pipes and shield, drag all along pipe joints. Settlement mechanism of low depths of pipe jacking or microtunneling is formation of a settlement trough on top of jacking pipes. Width of trough depends on soil properties; larger is cover depth of jacking pipes, larger is width of settlement trough. For same soil volume beating due to pipe jacking or microtunneling, width of settlement trough for shallow cover depth is lesser and so it results in a larger vertical utmost settlement.
assumptions made in the simple torsion theory
briefly explain the stacking of materials in the site for general building?
Determine the total Stopping Sight Distance in feet A motorist is travelling down a 6% grade at 65 mph and needs to stop because of a crash scene. Assuming a 2.0 sec PRT and 1
assignment on role of civil engineer
Calculate the Modulus of elasticity of concrete A pre-stressed concrete beam, having a cross-section of 150 mm width and 400 mm depth, is used over a span of 8 m. Straight tend
In order to determine the water content of a wet sand, a sample weighing 4 N was put in a pyknometer. Water was then poured to fill it and the weight of the pyknometer and its con
Actually, drying is not directly linked to hardness in concrete. After concrete is poured, putting it in a wet environment by spraying it constantly with water will hasten its hard
What are exogenous tree.explain
NEED TO DESIGN A CANTILEVER RETAINING WALL 8M HIGH, SATURATED UNIT WEIGHT IS 16KN/M3, SURCHARGE IS 7KN/M2, LOAD ABOVE WALL SUPPORTED ON WALL STEM IS 10KN/M RUN, ANGLE IN INTERNAL F
Movement accommodation factor is normally specified by manufacturers of joint sealants for designers to design dimension of joints. It is stated as the total movement that a joint
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd