Question
While pipe jacking or microtunneling, it is usually accepted that cover depths of jacking pipes cannot be also shallow as in less than 2D where D is the diameter of jacking pipes.Give some key reasons?
Answer
For pipe jacking or microtunneling, reasons of large settlement are defeat of face constancy, failure to even out ground around shafts, presence of annular gap around pipes and shield, drag all along pipe joints. Settlement mechanism of low depths of pipe jacking or microtunneling is formation of a settlement trough on top of jacking pipes. Width of trough depends on soil properties; larger is cover depth of jacking pipes, larger is width of settlement trough. For same soil volume beating due to pipe jacking or microtunneling, width of settlement trough for shallow cover depth is lesser and so it results in a larger vertical utmost settlement.
Maximum shear stress: The state of stress at a critical point of a strained solid is given by σ x = 70 kN/mm 2 , σ y = - 50 kN/mm 2 and τ xy = 45 kN/mm 2 . If the strength
First Can I use this device to test concrete specimen? Second it is very important for me that wouldn’t have tensile strength when I want to fix specimens. Because the specimens su
A sample in a variable head permeameter is 8 cm in diameter and 10 cm high. The permeability of the sample is estimated to be 10 × 10 -4 cm/s. If it is desired that the head in th
curing of brick masonry
Keywords related to water transportation: Oceanic Shipping: Shipping taking place in the oceans. Coastal Shipping: Shipping taking place along the coast line. Inlan
The design of flexible pavements how it is used
Determine the support reactions for the truss shown below
write buckling and dislodging of brick slip?
Question What is problem in traditional marine piling system of steel tubular pile with concrete infill and what are key possible remedial measures? Answer In design
how to prepare a project of final year
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd