What are the relevant costs involved, Operation Management

Assignment Help:

Process Solutions provides a computer-based document processing service. The accountant has produced the following analysis.

 

Standard

Modified

Advanced

Sales quantity

1,000

1,100

1,200

Selling price

£5

£5

£6

Sales revenue

5,000

5,500

7,200

Labour hours

100

120

160

Labour cost @ £20/hour

2,000

2,400

3,200

Contribution

3,000

3,100

4,000

Contribution per unit sold

£3

£2.82

£3.33

The Sales Manager, whose team is paid a commission on sales revenue prefers to sell the higher priced Advanced service. This is also the preferred service for the Accountant, although not for the same reason, as her argument is that the Advanced service is better because of the higher contribution per unit sold. The Operations Manager argues that the Advanced Service consumes more labour hours than the Standard or Modified services and as labour availability limits his ability to process work, this should also be taken into account. The Operations Manager prefers the Standard or Modified service as this provides greater ability to use his capacity more flexibly.

The General Manager has asked for your advice in relation to this disagreement within the management team.

11.2   Cowboy Constructions employs a full-time driver and incurs costs for a vehicle to deliver paperwork between each of their building sites. Select Couriers has offered to carry out the work to the same standard of service for a fixed sum of £2,000 per month. Cowboy's annual costs are currently:

Salary and oncosts of driver                      £16,000

Salary and oncosts of builder who

covers for sickness and annual leave

absences of driver                           £2,800

Depreciation of vehicle                     £2,500

Road tax, insurance & servicing         £1,000

Fuel                                               £3,000

Total                                             £25,300

If Cowboy uses Select Couriers, it will sell the vehicle for £2,000, and the driver's employment will be terminated without any redundancy payment. The builder who covers for sickness and leave of the driver is currently replaced by casual labour which costs £3,500.

What are the relevant costs involved in this decision? Should Cowboy sub-contract its delivery requirements to Select? What considerations are there in making this decision?

11.3  A spare parts supplier is thinking of building a car from the parts he has in his yard. He does not expect any reward for his labour but wants to know what costs he should include for the materials. He has provided the following information:

  • A chassis was bought for £100 and has no scrap value.
  • A reconditioned engine will cost £375. However, an old engine was bought for £50. It can either be sold in its present condition for £225 or additional parts costing £250 could be bought to bring to bring the engine to an equivalent standard to the reconditioned one.
  • Tyres costing £180 need to be purchased.
  • Paint is in stock at a cost of £60 but it will need to be replaced at its current price of £70.

11.4  Maximus Company has met all production requirements for the current month and has an opportunity to produce additional units of product with its excess capacity. Unit selling prices and unit costs for three models of one of its product lines are as follows.

 

Plain model

Regular model

Super model

Selling price

£30.00

£32.50

£40.00

Direct material

£9.00

£10.00

£9.50

Direct labour (@ £5 per hour)

£5.00

£7.50

£10.00

Variable overhead

£4.00

£6.00

£8.00

Fixed overhead

£8.00

£7.50

£7.50

Variable overhead is applied on the basis of direct labour dollars, while fixed overhead is applied on the basis of machine hours. There is sufficient demand for the additional production of any model of the product line.

a.  If Maximus Company has excess machine capacity and can add more labour as needed (i.e. neither machine capacity nor labour is a constraint), which product is the most attractive to produce? Provide calculations and reasons to support your answer.

b. If Maximus Company has excess machine capacity but a limited amount of labour time available, to which product or products should the excess production capacity be devoted? Provide calculations and reasons to support your answer.               


Related Discussions:- What are the relevant costs involved

Comparison between method and work measurement, Comparison between method a...

Comparison between method and work measurement: Method  study  is the  principle   technique  for reducing  the work  involved  primarily by eliminating unnecessary  movement

How to avoid penalties, Select an article relating to workplace safety and...

Select an article relating to workplace safety and answer the following questions: 1. briefly summarize the article 2. What alternatives could the place of business have taken in o

Why university refused to pay the card charges on the ground, Type your The...

Type your The University of North is the major state university. The University was preparing for its upcoming re-accreditation, so the University board set aside extra funds to ma

What do you think joe thomas must do about this matter?, What do you think ...

What do you think Joe Thomas should do about this matter?

Explain what is authentic leadership, What is authentic leadership? Why do ...

What is authentic leadership? Why do ethics and trust matter to leadership?

Rules related to the design of tools and equipment, Related to the  Desig...

Related to the  Design  of Tools and Equipment: 1.        The hands should  be relieved of all work  that can  done more  advantageously by a jig a  fixture  or a foot operate

Calculate electrical, Test results from an electronic circuit board indicat...

Test results from an electronic circuit board indicate that 50% of board failures are caused by assembly defects, 30% are due to electrical components, and 20% are due to mechanica

How team structure related to the project managers authority, How is the pr...

How is the project team structure related to the project manager's authority level?

Explain three major issues from a business perspective, When you look at th...

When you look at the field of benefits as an Employer what do you find to be the three major issues from a business perspective? Now look at benefits as an Employee and identify th

Explain approach to formulating a wbs for this project, Recommend the most ...

Recommend the most effective approach to formulating a WBS for this project.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd