Utilisation of buoyancy effect, Civil Engineering

Assignment Help:

Q. Utilisation of Buoyancy Effect?

Submerged part of the substructure will be subjected to buoyancy effect. The uplift pressure from the ground water can be utilised by constructing a water tight basement below the water table. Water table must remain at constant level for this method to be effective. Hence, location of the substructure very close to a large body of water is essential.


Related Discussions:- Utilisation of buoyancy effect

Explain the scaling - underwater inspection of bridges, Explain the Scaling...

Explain the Scaling - underwater inspection of bridges? Scaling is the gradual and continuing loss of the surface mortar and aggregate over an area. This condition is commonly

Explain dissolved impurities in water, Q. Explain Dissolved Impurities in w...

Q. Explain Dissolved Impurities in water? The impurities which are caused by the action of water and water forming Acids with organic matter and carbon dio

Brigdes, infomation about differnt brigdes

infomation about differnt brigdes

Wires in gabion walls, Gabions are wire mesh boxes that are filled with sto...

Gabions are wire mesh boxes that are filled with stones and they areplaced in an orderly pattern to act as a single gravity retaining wall. Meshes or Lacing wires are designed t

Building material, what is grillege foundation and where are use

what is grillege foundation and where are use

Handheld inspection tool for underwater inspection of bridge, Explain Handh...

Explain Handheld Inspection tools for Underwater Inspection of Bridge? Handheld tools such as flash lights, rulers, and tape measures for documenting areas; small or large hamm

Explain total dynamic head (tdh), Total Dynamic Head: (TDH) y-axis plo...

Total Dynamic Head: (TDH) y-axis plot point related to each x-axis flow rate along the system curve plot. TDH = h a = TSH + h f + v 2 /2g       v 2 / 2g usually small

Jacking face for pipe-jacking, Ground settlement occurs ahead or behind the...

Ground settlement occurs ahead or behind the jacking face for pipe-jacking? It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 ti

Surveying, how prepared for surveying?

how prepared for surveying?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd