. determine the permeability of the aquifer, Civil Engineering

Assignment Help:

An unconfined aquifer is called to be 32 m thick below the water table. A constant discharge of 2 cubic metres per minute is pumped out of the aquifer by a tubewell till the water level in the tubewell becomes steady. Two observation wells at distances of 15 m and 70 m from the tubewell show falls of 3 m and 0.7 m respectively from their static water levels. Determine the permeability of the aquifer.

 


Related Discussions:- . determine the permeability of the aquifer

Sss, #questiosssn..

#questiosssn..

Determine the statements about unit area or borrow pit, Determine the State...

Determine the Statements about Unit Area or Borrow Pit? Ans: I.  Sometimes called Average Depth II. Works well for volumes for building sites and surface mines III. Needs

Physical deterioration - underwater inspection of bridges, Define Physical ...

Define Physical deterioration - underwater inspection of bridges Typical defects include: -   Scaling -   Cracking -   Spalling -   Disintegration -   Abrasion

State average increase of pressure in the clay stratum, A building was to b...

A building was to be constructed on a clay stratum. Preliminary analysis showed a settlement of 60 mm in 6 years and an ultimate settlement of 250 mm. The average enhance of pressu

Determine load carried by each cylinder, Determine load carried by each cyl...

Determine load carried by each cylinder: A hollow steel cylinder of cross-sectional area 2000 mm 2 concentrically surrounds a solid aluminium cylinder of cross-sectional area

Addition of water to bored piles, Addition of water to bored piles In ...

Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e

Stone, Explain the crushing strength test

Explain the crushing strength test

Grade of cement, Grade of Cement: In India, the following grades of c...

Grade of Cement: In India, the following grades of cement are used for roads : Ordinary Portland Cement (OPC) Grade 33 Grade 43 Grade 53 Portland Pozz

Lubrication of rail joint, Lubrication of rail joints is one of the importa...

Lubrication of rail joints is one of the important items of permanent way works incidental to systematic track maintenance, the lubrication of joints is done for the following purp

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd