Q. Time to remove formwork to cater for early thermal movement?

Let's take a circular column as an illustration to explain effect of internal restraint to thick sections. 

When temperature is increasing, temperature in the core is higher than outer zone. The inner core would have a higher expansion and exert pressure to the outside. Induced compressive stress will yield the formation of radial cracks near the surface of concrete.

When temperature drops, concrete at outside drops to surrounding temperature whereas the concrete at central region continues to cool down. Contraction associated with inner concrete persuades tensile strains and forms cracks tangential to circular radius. 

It is advantageous for thick sections (say >500mm) to have late removal of formwork to decrease early thermal cracking. This is to enable more time for the centre of concrete section to cool down progressively to decrease the risk of thermal cracking. It is effective in controlling thetemperature differential across the cross section of concrete structures and decreasing the potential of internal cracking because of early thermal movement.


Related Discussions:- Time to remove formwork to cater for early thermal movement

Backward and forward curved vanes in pumps, Backward curved vanes vs. forwa...

Backward curved vanes vs. forward curved vanes in pumps  Power of a pump is related to discharge as follows: Power = k 1 Q + (k 2 Q 2 / tan A) Where K 1 and K 2 are

Steady flow energy equation, If there is steady flow, nothing changes with ...

If there is steady flow, nothing changes with time.  1. The properties of the fluid at entry and exit are constant. 2.  The properties of the fluid at any point in the contro

Insulating washer between steel bolts and aluminium plates, Q. Insulating w...

Q. Insulating washer between steel bolts and aluminium plates? Corrosion of aluminium can be activated by putting it in contact with another metal in the presence of water. Thi

Define the term - clamp splice, Define the term - Clamp splice In a Cla...

Define the term - Clamp splice In a Clamp splice, bolts and nuts alongwith clamp plates are used. Tendons are held in-between the clamp plates and these clamp plates are tighte

Determine the steps for routine inspection, Determine the Steps for routine...

Determine the Steps for routine inspection? A routine inspection should normally include: - A Level I inspection on 100% of the underwater portion of the structure to determ

Explain some points regarding to hardness, Explain Some Points regarding to...

Explain Some Points regarding to Hardness 1) Hardness removal using lime and soda is based on the solubility reactions of calcium carbonate, CaCO 3 and magnesium hydroxide, Mg

Surveying, explain operations of direct and indirect leveling?

explain operations of direct and indirect leveling?

Structural Engineering, I want to get help in my Steel Structure Project Th...

I want to get help in my Steel Structure Project Thanks

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd