The software life cycle model that incorporates risk factor, Software Engineering

Assignment Help:

Explain the software life cycle model that incorporates risk factor.

 The problem with traditional software process models is that they do not deal adequately with the uncertainty, which is inherent to software projects. Significant software projects failed because project risks were neglected and nobody was ready when something unforeseen happened. Barry Boehm recognized this and tried to incorporate the " project risk" factor into a life cycle model. The results is the spiral model, which was presented in 1986  BOEH86 Every loop of the spiral from X-axis clockwise by 3600 represents one phase. Single phase is split roughly into four sectors of major activities.

  • Planning : Determination of objectives, alternatives and constraints
  • Risk Analysis : Analyze alternatives and attempts to recognize and resolve the risks involved
  • Development : Product development and testing product
  • Assessment : Customer evaluation

 


Related Discussions:- The software life cycle model that incorporates risk factor

Iterative Enhancement Model, what is the advantage of Iterative Enhancement...

what is the advantage of Iterative Enhancement Model in developing a system?

Explain defect, Explain Defect? Ans) 1) From the producer's viewpoint: a...

Explain Defect? Ans) 1) From the producer's viewpoint: a product needs that has not been met or a product attribute possessed by a product or a function perform by a product tha

What is verification, Q. What is verification? Ans. Verification is...

Q. What is verification? Ans. Verification is the procedure of determining whether the output of one phase of software development conforms to that of its previous phase wh

State the technique pilot used in software engineering, State the technique...

State the technique Pilot used in software engineering With this approach, new system is introduced into one part of the company (for example into one warehouse of a supermark

The spiral model of software development, The spiral model of software deve...

The spiral model of software development Contains project risks evaluation during every iteration

One want record a data driven test then how will one do that, You want to r...

You want to record a data driven test. How will you do that? There are 3 ways to create a data-driven test: a.) By using data from a data table b.) By using data from a f

Illustrate the relationship between time and cost, Q. Illustrate the relati...

Q. Illustrate the relationship between Time and cost? In software projects, time cannot be freely exchanged against cost. Such a trade off is limited by the nature of the softw

Explain data collection, Data collection A metrics programme should be ...

Data collection A metrics programme should be based on a set of product and process data. Data should be collected immediately (not in retrospect) and, if possible, automati

Illustrate exploratory testing, Illustrate exploratory testing. - In ex...

Illustrate exploratory testing. - In exploratory testing approach testers are involved in maximum test execution and minimum planning. - Planning includes creation of a test

Explain ad hoc testing, Ad hoc testing is a testing approach. It is the lea...

Ad hoc testing is a testing approach. It is the least formal testing approach.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd