Explain the software life cycle model that incorporates risk factor.

 The problem with traditional software process models is that they do not deal adequately with the uncertainty, which is inherent to software projects. Significant software projects failed because project risks were neglected and nobody was ready when something unforeseen happened. Barry Boehm recognized this and tried to incorporate the " project risk" factor into a life cycle model. The results is the spiral model, which was presented in 1986  BOEH86 Every loop of the spiral from X-axis clockwise by 3600 represents one phase. Single phase is split roughly into four sectors of major activities.

  • Planning : Determination of objectives, alternatives and constraints
  • Risk Analysis : Analyze alternatives and attempts to recognize and resolve the risks involved
  • Development : Product development and testing product
  • Assessment : Customer evaluation

 


Related Discussions:- The software life cycle model that incorporates risk factor

Explain about the incremental model, Explain about the incremental model. ...

Explain about the incremental model. Have same phases as the waterfall model. Phases are Analysis. Design. Code. Test. Incremental model deliver

The most important feature of spiral model, The most important feature of s...

The most important feature of spiral model is Risk management is the important feature of spiral model.

Why system flowcharts are used, System flowcharts System flowcharts are...

System flowcharts System flowcharts are used to demonstrate how all the components in a system link together (for example input, storage, output, processing etc.). They are ver

What is data binding, Q. What is Data Binding? Ans. The matrix that at...

Q. What is Data Binding? Ans. The matrix that attempts to imprison the module-level concept of coupling is data binding. Data binding are a calculate that captures the data in

What is up time, What is Up time? "Up time" is the time period when a me...

What is Up time? "Up time" is the time period when a method is operational and in service. Up time is the sum of idle time and busy time.

Discuss in details about rapid prototyping techniques, Discuss in details a...

Discuss in details about rapid prototyping techniques. Executable specification languages. Used to animate the system specification. It is shown in a formal, mathemati

Distribution of the package, Distribution of the Package: In the last ...

Distribution of the Package: In the last 12 years of its existence CDS/ISIS software has become one of the most popular packages of its kind. It is estimated that there are ab

What is the advantages of iterative model, What is the advantages of Iterat...

What is the advantages of Iterative model This model is useful when less manpower is available for software development and release deadlines are tight. It's best suited for in

What are the three activities of risk assessment, What are the three activi...

What are the three activities of risk assessment? Ans: The three activities are analyzing, identifying and giving priorities. Risks are able to be identified by a check list

Justify the term software is engineered, Justify the term "Software is engi...

Justify the term "Software is engineered" Software is engineered not manufactured. Although some similarities exit among software development and hardware manufacture, the two

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd