The software life cycle model that incorporates risk factor, Software Engineering

Assignment Help:

Explain the software life cycle model that incorporates risk factor.

 The problem with traditional software process models is that they do not deal adequately with the uncertainty, which is inherent to software projects. Significant software projects failed because project risks were neglected and nobody was ready when something unforeseen happened. Barry Boehm recognized this and tried to incorporate the " project risk" factor into a life cycle model. The results is the spiral model, which was presented in 1986  BOEH86 Every loop of the spiral from X-axis clockwise by 3600 represents one phase. Single phase is split roughly into four sectors of major activities.

  • Planning : Determination of objectives, alternatives and constraints
  • Risk Analysis : Analyze alternatives and attempts to recognize and resolve the risks involved
  • Development : Product development and testing product
  • Assessment : Customer evaluation

 


Related Discussions:- The software life cycle model that incorporates risk factor

Define about the erroneous data - Test data, Define about the erroneous dat...

Define about the erroneous data - Test data Abnormal/erroneous data  -  This is data outside the limits of validity/acceptability and must cause an error message to be g

Discuss the various strategies of design, Q. Discuss the various strategies...

Q. Discuss the various strategies of design. Which design strategy is most popular and practical? Ans The most commonly utilized software design strategy involved decomposing

Test questions, Dear Sir/ Madam I have some remaining test questions need ...

Dear Sir/ Madam I have some remaining test questions need to be answered, from yesterday''s test bank can I get a solution please? Regards John

Explain quality control, What is Quality control? This includes checkin...

What is Quality control? This includes checking the software development process to ensure that procedures and standards are being followed. There are two approaches to qual

Define about the requirement traceability matrix, When is RTM (Requirement ...

When is RTM (Requirement traceability matrix) prepared - after or before test case designing? - RTM is prepared before test case designing. - Requirements must be traceable

Explain the test case, Test Case A test case is a unit level document d...

Test Case A test case is a unit level document describing the inputs, steps of implementation and the expected result of each test condition for each requirement from the BRD.

Define the factors of prime concern for system modeling, Define the factors...

Define the factors of prime concern for system modeling Following four factors are of prime concern for system modeling: 1. System modeling is undertaken with some simplifyi

Draw E-R diagram for the given situation, Draw E-R diagram for the followin...

Draw E-R diagram for the following situation An account is a relationship between customer and bank. A customer has a name. A bank has a branch. A customer may have numerous ac

Explain about the software testing strategies, Explain about the software t...

Explain about the software testing strategies. A method approach to software testing. Verification and Validation. Verification refers to the set of activities that ma

Explain agent-oriented programming languages, Question: (a) Name two a...

Question: (a) Name two agent-oriented programming languages. (b) Distinguish between communication protocols and interaction protocols for agent systems. Give two example

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd