Explain the software life cycle model that incorporates risk factor.
The problem with traditional software process models is that they do not deal adequately with the uncertainty, which is inherent to software projects. Significant software projects failed because project risks were neglected and nobody was ready when something unforeseen happened. Barry Boehm recognized this and tried to incorporate the " project risk" factor into a life cycle model. The results is the spiral model, which was presented in 1986 BOEH86 Every loop of the spiral from X-axis clockwise by 3600 represents one phase. Single phase is split roughly into four sectors of major activities.
Explain about the incremental model. Have same phases as the waterfall model. Phases are Analysis. Design. Code. Test. Incremental model deliver
The most important feature of spiral model is Risk management is the important feature of spiral model.
System flowcharts System flowcharts are used to demonstrate how all the components in a system link together (for example input, storage, output, processing etc.). They are ver
Q. What is Data Binding? Ans. The matrix that attempts to imprison the module-level concept of coupling is data binding. Data binding are a calculate that captures the data in
What is Up time? "Up time" is the time period when a method is operational and in service. Up time is the sum of idle time and busy time.
Discuss in details about rapid prototyping techniques. Executable specification languages. Used to animate the system specification. It is shown in a formal, mathemati
Distribution of the Package: In the last 12 years of its existence CDS/ISIS software has become one of the most popular packages of its kind. It is estimated that there are ab
What is the advantages of Iterative model This model is useful when less manpower is available for software development and release deadlines are tight. It's best suited for in
What are the three activities of risk assessment? Ans: The three activities are analyzing, identifying and giving priorities. Risks are able to be identified by a check list
Justify the term "Software is engineered" Software is engineered not manufactured. Although some similarities exit among software development and hardware manufacture, the two
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd