  • Conditioning load : Bearings shall be preloaded with maximum horizontal load Htest (with Ntest or vertical load held constant) and unloaded before test loading.
  • Rate of loading : Ntest corresponding to σm = 5 MPa shall be held constant during test and the horizontal loading H shall be gradually increased to yield a shear stress rate of approximately 0.05 to 0.1 MPa per minute.
  • Maximum test loading Ntest : The horizontal loading H shall be increased upto a maximum Htest which corresponds to horizontal deflection equal to 'h' (total elastomer thickness).
  • Measurement : Load and deflection measurements shall be calculated at approximately equal intervals not less than 5.

Related Discussions:- Test for determination of shear modulus

Surface drainage, Surface Drainage: Surface drainage deals with arran...

Surface Drainage: Surface drainage deals with arrangement for quickly leading the water from rainfall away from the surface of pavements, shoulders, slopes of embankments and

Compute interior or intersection angle, Compute Interior or Intersection An...

Compute Interior or Intersection Angle for the following circular curve:   Answer- I = 180° - 60° - 60°= 60

Concrete structure, which section is most effective for a design of beam an...

which section is most effective for a design of beam and why

Correction for construction period, You are aware that construction of any ...

You are aware that construction of any type of structure takes sometime. Pressure due to the building will be applied gradually and not instantaneously. Excavation for the construc

Explain about catch sidings, Q. Explain about Catch Sidings? Normally a...

Q. Explain about Catch Sidings? Normally all catch sidings except those which are sanded shall be kept alive. On sanded catch siding, the rails shall be kept clear of sand for

Explain hot weather patrolling, Q. Explain Hot weather Patrolling ? Hot...

Q. Explain Hot weather Patrolling ? Hot weather Patrolling is done for LWR and CWR tracks when the rail temperature reaches td + 20 0 C and above and td + 14 0 C for Central

Construction equipments, what is preventive maintenance and state its advan...

what is preventive maintenance and state its advantages

Explain about the pot bearing - bridge bearing, Explain about the Pot Beari...

Explain about the Pot Bearing? POT bearing was developed in 1959 as an alternative to heavy steel sliding bearings. It consists of a circular non-reinforced rubber-pad fully en

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd