Compaction to freshly placed concrete piles 

In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compaction. The use of vibrating devices such as poker vibrators is rarely adopted for the compaction of concrete piles. As a matter of fact, other than the consideration of the impracticality in using vibrating device in long piles, there is serious concern about possible occurrence of aggregate interlock that poses difficulty at the time of casing extraction. In the worst scenarios, temporary casings together with reinforcement cages are extracted at the time of the lifting up of pile casings. This is another reason that accounts for not using vibrating machines for piles with casing extraction.


Related Discussions:- Compaction to freshly placed concrete piles

Determine the station and elevation of turning point, A -3.00% grade inters...

A -3.00% grade intersects a +1.25% grade at Sta. 85+80 and elevation 210.00 ft.  A 350-ft vertical curve connects the two grades.  Determine the station and elevation of turning po

Free- fall concrete placement in bored piles, Q. Free- fall concrete placem...

Q. Free- fall concrete placement in bored piles? Based on the research by STS Consultants Ltd it was found that concrete placed by free falling below 120 feet will not suffer f

Brick masonry., an opening of width 3m and height 2.7 in a brick masonary h...

an opening of width 3m and height 2.7 in a brick masonary has to be provided with door cum window. plan, elevation, section and 2 joining details

What is chamfering of rail, Q. What is Chamfering of rail? Chamfering o...

Q. What is Chamfering of rail? Chamfering of rail holes has been done for the life of rail hole is increased and chances of the rail hole developing any crack is eliminated.

Determine the cubic yard in the ground, An earthwork contractor encountered...

An earthwork contractor encountered a location within the borrow area where the geological conditions changed.  Instead of encountering 100 cubic yards of wet clay, the contractor

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

What do you mean by M.A.S. accounts, Q. What do you mean by M A S Accounts?...

Q. What do you mean by M A S Accounts? This stands for material at site account. This is a suspense head of account that is maintained to watch actual consumption of materials

Relation of the angle of contact between pipe invert, Relation of the angle...

Relation of the angle of contact between pipe invert and bedding material to the load resisting capacity of pipe Minimum crushing strength is a generally adopted parameter for

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd