Compaction to freshly placed concrete piles, Civil Engineering

Assignment Help:

Compaction to freshly placed concrete piles 

In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compaction. The use of vibrating devices such as poker vibrators is rarely adopted for the compaction of concrete piles. As a matter of fact, other than the consideration of the impracticality in using vibrating device in long piles, there is serious concern about possible occurrence of aggregate interlock that poses difficulty at the time of casing extraction. In the worst scenarios, temporary casings together with reinforcement cages are extracted at the time of the lifting up of pile casings. This is another reason that accounts for not using vibrating machines for piles with casing extraction.


Related Discussions:- Compaction to freshly placed concrete piles

Application of bitumen to driven piles, Q. Application of bitumen to driven...

Q. Application of bitumen to driven piles? In a certain area of H-piles subjected to ground water table fluctuation, painting is occasionally applied on the surface of H-piles

Chain survrying, How do we overcome obstacle like river in chain survey?

How do we overcome obstacle like river in chain survey?

Choosing between trailer suction hopper and grab dredgers, Question In ...

Question In search reclamation, what are considerations in choosing between trailer suction hopper dredgers and grab dredgers ? Answer Trailer suction hopper dred

Show the result of vulcanization, Q. Show the result of vulcanization? ...

Q. Show the result of vulcanization? As a result of vulcanization, rubber molecules are cross-linked with sulphur. This cross-linking makes the rubber stronger. It allows the r

Chain survey, what are the obstacles in chain survey in brief

what are the obstacles in chain survey in brief

Cement, CEMENT Cement is a normally used binding material in the constr...

CEMENT Cement is a normally used binding material in the construction. By burning a mixture of argillaceous (clay) and calcarious (calcium)  material at a very high temperature

Traverse, how to fill traverse computation sheet of opened traversig ..

how to fill traverse computation sheet of opened traversig ..

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd