Compaction to freshly placed concrete piles, Civil Engineering

Assignment Help:

Compaction to freshly placed concrete piles 

In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compaction. The use of vibrating devices such as poker vibrators is rarely adopted for the compaction of concrete piles. As a matter of fact, other than the consideration of the impracticality in using vibrating device in long piles, there is serious concern about possible occurrence of aggregate interlock that poses difficulty at the time of casing extraction. In the worst scenarios, temporary casings together with reinforcement cages are extracted at the time of the lifting up of pile casings. This is another reason that accounts for not using vibrating machines for piles with casing extraction.


Related Discussions:- Compaction to freshly placed concrete piles

Need survey paper, Write a Survey Paper: Write between 7 to 10 pages a...

Write a Survey Paper: Write between 7 to 10 pages a survey paper in one of the following topic :  ( The Future of HCI. )  For the paper the font size should be 12 points

Construction health & safety, List different access equipment & their uses ...

List different access equipment & their uses wih pictures

Show the functions of sleepers in railway, Q. Show the Functions of sleeper...

Q. Show the Functions of sleepers in railway? Functions of sleepers in railway works are as below:  (i)  The primary function of a sleeper is to grip the rail to gauge and t

Determine the thermal stress in the bar, Determine the thermal stress in th...

Determine the thermal stress in the bar: A stepped bar made of aluminum is held between two supports. The bar is 900 mm in length at 38ºC, 600 mm of which is having a diameter

Define inspection of steel or cast iron substructures, Define Inspection of...

Define Inspection of Steel or Cast Iron Substructures? Corrosion is the principal cause of deterioration in steel waterfront substructures. On bare un-protected steel pilings,

Pycnometer., To determine the specific gravity of fine aggregate (sand) by ...

To determine the specific gravity of fine aggregate (sand) by Pycnometer.

Modulus of elasticity of light-weight concrete, Modulus of elasticity of li...

Modulus of elasticity of light-weight concrete The modulus of elasticity of light-weight concrete is about 50 to 55% of that of normal-weight concrete. The loss of prestresses

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd