Surveying, Civil Engineering

Assignment Help:
Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was continued the total distance of 2km up to C at the end of the work chain was found to be 20 mm to long .find the correct distance of ABC

Related Discussions:- Surveying

Upper floor, We need all types of Upper floor

We need all types of Upper floor

Drawbacks of curing by ponding and polythene sheets, Question What are the ...

Question What are the main drawbacks of curing by ponding and polythene sheets ? Answer Purpose of curing is to decrease the speed of heat loss of freshly placed concrete to atm

Foundation, write the types of foundation for black cotton soil and exxplin...

write the types of foundation for black cotton soil and exxplin with drowing?

Permanent repairs to rail fracture, Q. Permanent Repairs to rail fracture? ...

Q. Permanent Repairs to rail fracture? (i) If the fracture is such that, wide gap A T welding ban be adopted, then the total length of fractured ends to-be cut shall be equal t

Modes of transport, Modes of Transport Various Modes of Transport ...

Modes of Transport Various Modes of Transport There are several modes of transport which can be developed by a country. In every country, the principal modes exist ar

State about the pre-tensioned concrete beam, State about the pre-tensioned ...

State about the pre-tensioned concrete beam A pre-tensioned concrete beam, 200 mm wide and 300 mm deep, is prestressed by straight wires carrying an initial force of 150 kN at

Define the most probable error, If the standard deviation of an observation...

If the standard deviation of an observation is ± 10-ft, the most probable error would be: The most probable error is defined as the error for which there are equal chances of t

High strength friction grip bolts and normal bolts, High strength friction ...

High strength friction grip (HSFG) bolts vs. normal bolts HSFG bolts have the following benefits when compared with normal bolts: (i)  Performance of preloaded HSFG bolts u

Surveying, A pre- engineering base line was run down a very steep hill.rath...

A pre- engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd