Considerable frictional loss takes place due to friction between the tendon and the material surrounding it, namely the concrete or the sheathing. Loss due to friction may be classified as below.

(a) loss due to length effect, and

(b) loss due to curvature effect.


Related Discussions:- State the term- friction in tendon

Determine the strain compatibility method, Determine the Strain Compatibili...

Determine the Strain Compatibility method For estimating the ultimate strength of prestressed concrete members in flexure, 'Strain Compatibility method' may be used. For calcul

Open channel, design of irrigation channel permissible velocity table

design of irrigation channel permissible velocity table

Classification of timber based on grading, Classification Based on Grading:...

Classification Based on Grading: IS 883-1970 classifies the structural timber into 3 grades-select grade, grade I and grade II. The classification is depend on, defects, permi

Explain the term - strength cement, Explain the term - strength cement ...

Explain the term - strength cement It should be appreciated that the tensioning arrangement shall have to be kept in place until tendons are cut. This shall depend on how quick

Draw the variation in total stress, Draw the variation in total stress, eff...

Draw the variation in total stress, effective stress, and pour water pres- sure up to a depth of 6 m below ground level, given the following data. The water table is 2 m below grou

Calculate the resultant hydrostatic force, Five 1m diameter, 2m high cylind...

Five 1m diameter, 2m high cylindrical drums filled with earth are placed upright and side-by-side in a straight line across a 5m wide creek to form a simple dam completely blocking

Determine about the post-tensioned concrete, Determine about the post-tensi...

Determine about the post-tensioned concrete The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling th

Treatment plant - sewer construction, Treatment plant - sewer construction:...

Treatment plant - sewer construction: Problem: How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant? Solution An a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd