State the short-term deflections, Civil Engineering

Assignment Help:

State the short-term deflections

If  short-term deflections are considered, the instantaneous deflection due to design loads may be calculated using elastic analysis based on the uncracked section and the Young's modulus of elasticity of  concrete.  

 


Related Discussions:- State the short-term deflections

Soil compaction, Soil Compaction: Soils used in road construction nee...

Soil Compaction: Soils used in road construction need to be thoroughly rolled and compacted. Compaction of soil is needed for the following reasons. (a) A well compacted s

Relation of the angle of contact between pipe invert, Relation of the angle...

Relation of the angle of contact between pipe invert and bedding material to the load resisting capacity of pipe Minimum crushing strength is a generally adopted parameter for

Coagulation, incoming water contains 15 mg/L as a substance

incoming water contains 15 mg/L as a substance

Comparison of pre and post-tensioning, Comparison of pre and post-tensionin...

Comparison of pre and post-tensioning A comparison between pre-tensioned and post-tensioned concrete members can be made on the basis of the following considerations. (a) T

Unreinforced concrete pavement function without mesh, Question How can ...

Question How can it would be able for unreinforced concrete pavement function without mesh reinforcement ? Answer Concrete carriageway, it is usually classified into t

Precaution of damp, i need simple ans for this question tell me precaution ...

i need simple ans for this question tell me precaution of dampness

Explain template jig, Explain Template Jig? 1) Template jig is the simp...

Explain Template Jig? 1) Template jig is the simplest type of jig, employed for accuracy than speed. 2) This jig fits over, on, or, into the work and is not generally clampe

Define limitations of underwater magnetic particle testing, Define Limitati...

Define Limitations of Underwater Magnetic Particle Testing? As with any non-destructive test method, UWMT has some limitations as under: i. Underwater magnetic particle tes

Sewer, what are the procedure of surveying for sewer projects/

what are the procedure of surveying for sewer projects/

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd