Define Diver Qualification - Diving Operation for Bridge Inspection?
The requisite qualification for divers and diving supervisors are given in IS 10291 -1982, which stipulates that the diver:
- Should be at least 18 years of age.
- Should be certified as being fit for diving by a qualified medical practitioner within the previous six months.
- Should be satisfactorily checkedto the maximum pressure he is to work in diving dress in water, or to an equal pressure in a compression chamber.
- Should comprise thorough knowledge of diving signals (IS 10291).
- Should be competent in the use of helmet, diving equipments.
- Should be able to conduct a circular search in the bottom under conditions of no visibility and in at least 0.6m depth of mud or soft silt.
- Should be capable to work on platform suspended under water.
On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft sub-g
difference between piles and pier
advantage and disadvantage of spirit levelling
processing of material
the two side are 17 cm and 28 cm long. and the lenght of the drawn to the third side is equal to 19.5cm. find tghe distance from an endpoint of this medianto the longest s8ide
whether the wall has adequate sliding resistance
• The previous load analysis represents a first and necessary step in the analysis of the given structure but it does not tell us whether the given load can be safely supported (i.
how to solve the problems of cross sectional surveying and profil questions
a soil sample is 38mm in diameter and 76mm and in its natural condition weighs 168g.when dried completely in an oven weighs 13o.5g.the value of Gs is 2.73.what is the degree of sat
The 6 monthly payment application for the construction of a $70,000,000 University dormitory is analyzed and the summary accounting show: the budgeted cost of work performed is $14
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd