Explain the primary treatment for wastewater, Civil Engineering

Assignment Help:

Explain the Primary Treatment for Wastewater

Primary Treatment: to remove the pollutants that floats or settles. Typically 60% of suspended solids and 35% of BOD5 are removed. At one time this was the only treatment used by many cities.  Now federal law requires the municipalities to provide secondary treatment.


Related Discussions:- Explain the primary treatment for wastewater

Determine the water content of the sand sample, In order to determine the w...

In order to determine the water content of a wet sand, a sample weighing 4 N was put in a pyknometer. Water  was then poured to fill it and the weight of the pyknometer and its con

Draw the shape of the pressure line, Draw the shape of the Pressure line. ...

Draw the shape of the Pressure line. Solution The locations of resultant force at sections A-A, B-B  and C-C have already been determined. Joining these locations, we can dr

Influence of pressure in the soil, Q. Influence of Pressure in the Soil? ...

Q. Influence of Pressure in the Soil? Figure shows the stress state beneath a footing. The steady state situation prior to footing as well as qualitative variation of pressure

Steel and timber structures, design a tension member subjected to a pull of...

design a tension member subjected to a pull of 300KN using a channel section. the length of a joint available is only 400mm.check the condition of using lug angle for end connecti

Differences between open shield and closed shield, Q. Differences between o...

Q. Differences between open shield and closed shield? Open shield type TBM refers to those providing lateral support only. They can be further classified into single shield and

Properties of ordinary portland cement, Properties of Ordinary Portland Cem...

Properties of Ordinary Portland Cement (i) Chemical properties: Portland cement consists chemical compounds are following: (a) Tricalcium silicate          3 CaO.SiO 2 (C

Role of each mode of transport, Role of Each Mode of Transport: Each ...

Role of Each Mode of Transport: Each mode of transport has its own role to play in a country. The role of each is as under: Roads : Road transport carries 80 per cent of

Define bank volume to be stockpiled and used for backfill, An earthwork con...

An earthwork contract was awarded to excavate and backfill the foundation of a proposed 50-ft by 50-ft office building.  The existing grade elevation is 437.5-ft while the sub-base

Surveying, dumpy level and its procedure

dumpy level and its procedure

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd