State about the pre-tensioned concrete, Civil Engineering

Assignment Help:

State about the pre-tensioned concrete

In pre-tensioned concrete, the tendon stresses are transferred  to concrete by  virtue of bond  of concrete to the  surface of steel tendons. As mentioned carlier, the bond strength of concrete with steel depends on the grade or characteristic strength of concrete. So  to transfer a high value of force from tendons to concrete it  is essential to have concrete of a high  strength.

 


Related Discussions:- State about the pre-tensioned concrete

Define npdes sampling requirements, Define NPDES Sampling Requirements? ...

Define NPDES Sampling Requirements? The sampling needs under NPDES are given at 40 CFR Part 122, as part of the needs for applying for an NPDES discharge allow. The needs are b

#tiphysics in civil engineering tle.., Ask questapplication of physics in c...

Ask questapplication of physics in civil engineering ion #Minimum 100 words accepted#

Torsional pendulum, define rigidity modulus and mention its units?

define rigidity modulus and mention its units?

What is bonded post-tensioning, What is Bonded Post-tensioning In post...

What is Bonded Post-tensioning In post-tensioned construction, ducts, in which tendons are provided, are sometimes grouted after the stressing operation. Though the mechanism

State the term directly below the edge of the footing, The load from a cont...

The load from a continuous footing of 1.8 metres width, which may be considered to be a strip load of considerable length, is 180 kN/m 2 . Verify the maximum principal stress at 1.

Show the direction of gunning in shotcreting, Q. Show the Direction of gunn...

Q. Show the Direction of gunning in shotcreting? At the time of the construction of shotcrete, it is intended at gunning the full thickness in one single operation and this hel

Determine the ground elevation, The trigonometric levelling from the survey...

The trigonometric levelling from the surveyor's notes is shown below. The ground elevation of T (ft) is most nearly: Solution:  The elevation of point P can be found from: E

Construction Planning, A contractor has both a 3-cy and a 5-cy shovel in th...

A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working day

Acetylene gas cylinder for gas welding, Q. Acetylene gas cylinder for gas w...

Q. Acetylene gas cylinder for gas welding to be erected in upright position Acetylene gas is normally used for gas welding due to its simplicity in production and transportati

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd