Q. Permanent Repairs to rail fracture?

(i) If the fracture is such that, wide gap A T welding ban be adopted, then the total length of fractured ends to-be cut shall be equal to the gap required for wide gap welding. Once the two ends are cut, a gap required for wide gap welding will be created by using rail tensors and joint welded by wide-gap Alumino Thermit welding technique.

ii) In case rail closure Temporary Repairs ( ii ) ( a ) has been provided for temporary repairs one joint of the closure rail shall be welded without rail tenser after setting correct gap for welding. However to ensure correct gap during welding of the other joint, tensor shall be used.

iii) In case rail closure as per Temporary Repairs (ii) (b) has been provided at the time of temporary repairs, the rail closure shall be suitably cut such that the length of the rail to be final inserted in track is equal to length of rail remove from track after fracture minus allowances for two welds i.e. 50 mm. Once the closure rail is cut, the closure rail will be welded.

iv) After welding of joints, a length of track equal to breathing length or about 125 meters on either side be unfastened and tapped to ensure equalisation of stress and then refastened.


Related Discussions:- Permanent repairs to rail fracture

Indicate quality of rock foundation, Question During piling works, norm...

Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by

Rcc, difference between RCC and RBC

difference between RCC and RBC

Keywords related to modern trends in transportation, Keywords related to Mo...

Keywords related to Modern Trends in Transportation: Exclusive Bus Lane :           A lane reserved exclusively for buses. High Capacity Bus System            :

Explain the surface water treatment methods, Explain the Surface Water Trea...

Explain the Surface Water Treatment Methods A. Physical Unit Operations change in water quality is brought about through the application of physical forces screenin

Trusses design, does the truss pitch relate to the building''s height?

does the truss pitch relate to the building''s height?

Explain the equation for a suppressed rectangular weir, Explain the Equatio...

Explain the Equation for a Suppressed Rectangular Weir If the approach velocity is negligible, velocity head can be excluded and the equation becomes the Francis weir equation

How can you design side slope of bank, Q. How can you design Side Slope of ...

Q. How can you design Side Slope of bank? Angle of bank should be flatter than angle of repose of pitching material. Angle of repose of sand is 2:1 while that of stone is about

Curved beams, Sir how can we find location of neutral axis for a curved bea...

Sir how can we find location of neutral axis for a curved beam of circular cross section,,,

Float or slack of an activity is positive or negetive, 1. What take place w...

1. What take place when float or slack of an activity is positive Ans: It represents a situation where extra resources are available and the completion of the project is not de

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd