Q. Show the support locations for truckable skid?
Unless instructed otherwise by Engineer, support locations for truckable skid shall be determined by skid Vendor. Support locations shall be clearly marked on Vendor's skid framing plan, including loads at each support. Where required, detail on drawing special connections for lifting of skid. Maximum distance between skid supports shall be 6m.
Truck-able skids will normally be lifted. Vendor shall design and install necessary lifting lugs in accordance with criteria in GS-904-0103.
Large modules transported by sea barges shall be supported by grid system of welded wide flange transportation beams in accordance with GS-904-0107-AR. The design of connections of large modules to barge deck shall be provided by Owner unless specified otherwise in contract documents.
GMAW POWER SOURCE A power source wit h a flat characteristics is almost universally used for GMAW process as it provides self adjustment and stabilisation of the arc. Also it m
1
what is the normalizing of steel
what are the properties magnet ? also how the repulsion is measured?
Compute the force in the rod: A rod ABC rotating at 20 rpm about a vertical axis through A, supports a ball of mass 10 kg at its lower end. It is fixed in position by the rod
sketch and discuss the uses and application of the following types of cam follower;knife edge,roller and flat ended.
what are the factors that affecting the fatigue behaviour of materials?
Link O4C of a 4-bar mechanism is subjected to a torque T4=1Nm[ccw]. The link BC is subjected to a force Q=45N @900 downwards. Determine the torque T2 on link O2B and the reactions
NON-FERROUS MATERIALS: Latest technology has been highly dependent on non-ferrous and alloys for in specific cases they represent the compensation of high strength and low wei
Q. Piping Inspection and Test Plan? Piping Inspection and Test Plan review and Piping Materials Test Results review shall be by the Piping Materials group, or by / with assista
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd