Q. Setting and installations of insulation?

The setting and installations of insulation shall be to Specification No. later.

The steam drum surfaces shall be insulated with minimum 50.8 mm (2") blanket insulation.

All surfaces exposed to the element of weather shall be insulated minimum 50.8 mm (2"). Block insulation shall be covered with weather proof cement and external galvanized casing.

Refractory lining shall be installed as per Specification No. later.

Inlet channels, outlet channels and tubesheets shall be refractory lined with a duo layer, or monolithic layer of refractory of a minimum 100 mm (4") hot face and minimum 75 mm (3") back-up, if required. The hot-face layer shall consist of a minimum 80% (WT) alumina.

Appropriate materials shall be supplied, subject to a approval by WorleyParsons Canada.

Anchors of TP 316 SS, 6 mm (1/4") thick, shall be spaced on a maximum 175 mm (6 7/8") square pattern, or a 1.75 times the hot-face liner thickness, whichever is more limiting.

Perforated metal shrouding shall be installed on the outside of the WHB channel section which are refractory lined. Refractory lined inlet and outlet connections require shrouding.

Shrouding shall be designed to maintain minimum metal temperature of 177oC (350oF) to prevent condensation and the formation of sulfuric acid between the refractory and the shell.


Related Discussions:- Setting and installations of insulation

Prototype sand blast method, During the test run of prototype machine we fo...

During the test run of prototype machine we found out a few issue occurred due to blasting room design problem. The blasting room design is too quartet, this design had cause the b

Belt and rope friction, what is the effect of a warm groove on the performa...

what is the effect of a warm groove on the performance of the V belt

Metals and Melting practices - alloy, Metals and Melting Practices - Alloy,...

Metals and Melting Practices - Alloy,Blowing,Carbon Monoxide Normal 0 false false false EN-IN X-NONE X-NONE Microsoft

Determine the dead load - sewer construction, Determine the dead load: ...

Determine the dead load: A 250 mm diameter sewer is placed in a 2.75 m deep rectangular trench that is 0.65 m wide. This trench is backfilled with saturated clay having a unit

Viscoelasticity, howto calculate area in hysteresisn..

howto calculate area in hysteresisn..

System of loads - beam, System of loads -  Beam: Build the SFD & BMD ...

System of loads -  Beam: Build the SFD & BMD for 10 m span simply supported beam subjected to a system of loads as illustrated in Figure . Figure Taking moment a

GOVERNORS, Explain Wilson HArtnell Governor

Explain Wilson HArtnell Governor

Explain construction and working of rope brake dynamometer, Explain constru...

Explain construction and working of Rope Brake Dynamometer? Determine Power also ?

Agitation and aeration systems, Careful consideration of the bioreactor agi...

Careful consideration of the bioreactor agitation and aeration system is required in order to maintain a homogeneous environment and provide sufficient oxygen transfer rates to mee

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd