Resource management for project, Mechanical Engineering

Assignment Help:

Q. Resource Management for project?

An important factor in overall project success is the provision of suitable and adequate resources. The initial estimate of engineering manhours and schedule provide the basis for the planned resource allocation (manpower) to a project.

Just as important as the original manpower plan is the subsequent monitoring of resources. Project changes in scope and schedule along with an ongoing evaluation of progress measurement can lead to deviation from the original plan and the need to re-assess manpower allocated to the project.

In consideration of the above, the Lead Mechanical Engineer will undertake periodic reviews (weekly, bi-weekly, etc., as identified in the Project Execution Plan) of engineering performance (manhours planned/ spent, progress) in order to determine if any corrective actions are required.


Related Discussions:- Resource management for project

Compute the total drag force on the plate , A uniform air stream with veloc...

A uniform air stream with velocity U = 10m/s flows over a flat plate of length 10 meters in the first meter the boundary layer is laminar but beyond this point boundary layer is fu

Swot Analysis, what are the threats of mechanical engineering ?

what are the threats of mechanical engineering ?

What are relevant design considerations, What are relevant design considera...

What are relevant design considerations? The relevant design considerations may be summarized as follows: a. Main reinforcement (uniformly distributed) is placed in a longit

Find the machine torque angle, Find the Machine Torque Angle (a)  What...

Find the Machine Torque Angle (a)  What are the four operating conditions that must be satisfied before a synchronous machine can be synchronised to an electrical grid? (b)

Shear force and bending moment, question no 2,page no 84 of strenght of mat...

question no 2,page no 84 of strenght of materials by G H Ryder

Bolter - thermodynamics, Bolter: ( k E 2  - kE 1) = 0, ( pE 2  - pE...

Bolter: ( k E 2  - kE 1) = 0, ( pE 2  - pE 1) = 0, w 1-2  = 0 Now,   q 1-2 = w 1-2  ( h 2  - h 1 ) + ( kE 2  - kE 1 ) + ( pE 2  - pE 1 ) q 1-2 =

Overview of project phases, Q. Overview of Project Phases? Conceptual ...

Q. Overview of Project Phases? Conceptual Engineering Phase The purpose of this phase of work is to develop the Client's proposal to a level of detail adequate to determin

Dry saturated steam - thermodynamics, Dry Saturated Steam - thermodynamics:...

Dry Saturated Steam - thermodynamics: A dry saturated steam is single phase medium. It does not have any water particle. It can be obtained on complete evaporation of water at

Explain types of patterns, Types Of Patterns There are various types of...

Types Of Patterns There are various types of patterns depending upon the complexity of the job, the number of castings required and the moulding procedure adopted. Singl

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd