Insulation for personnel protection, Mechanical Engineering

Assignment Help:

Q. Insulation for personnel protection?

Insulation for personnel protection shall be provided as follows on all piping and equipment adjacent to work platforms or other operating areas where the maximum operating bare metal temperature exceeds 60ºC:

a) horizontal piping where the bottom of pipe elevation is less than 2.5 m above grade or a working platform;

b) those portions of vertical piping less than 2.5 m above grade or a working platform;

c) piping adjacent to and within 600 mm of a working platform; and

d) where specified by OWNER.

Insulation of piping for personnel protection shall be limited to pipe and pipe fittings, excluding flanges and valves.

Where required, insulation for personnel protection shall be installed from 150 mm above grade or working platform to a height of 2.5 m above grade or working platform.

Insulation for personnel protection is not required where screens are to be installed for this purpose.

Where alternate personnel protection measures are considered economical, details shall be submitted to OWNER for approval.


Related Discussions:- Insulation for personnel protection

Scope of wps and pqr, Scope of WPS and PQR A Welding Procedure Specific...

Scope of WPS and PQR A Welding Procedure Specification (WPS) is written qualified welding procedure prepared to provide direction for making production welds to code requiremen

Vented causeway, Vented Causeway: Vented causeways are structures pro...

Vented Causeway: Vented causeways are structures provided with vents (usually pipes) to take care of dry weather perennial flows and which allow water to overflow the paved b

Concurrent force system - mechanics, Concurrent force system: It state...

Concurrent force system: It state that if force acting at a point on a rigid body, it can be considered to act at any other point on its line of action, given this point is ri

Wire feeding unit-co2 welding, WIRE FEEDING UNIT The wire electrodes ar...

WIRE FEEDING UNIT The wire electrodes are supplied as continues coils in wire spools. The solid wires are available in the following sizes 0.8, 1.0, 1.2, 1.6, 2.0 and 2.4 mm di

Objectives of planning, What are the objectives of Planning, production and...

What are the objectives of Planning, production and control ? What are the decisions involved in PPC ? What are the information needed for these decisions ?

What is strap footing, What is strap footing? Strap Footing You have...

What is strap footing? Strap Footing You have to use cantilever or strap footings when the proximity of a property line precludes the use of other types for example an isola

ISMB 250, WHAT IS LOAD CARRYING CAPACITY ISMB 250 OF 1.2 MTR LENGTH. PL REP...

WHAT IS LOAD CARRYING CAPACITY ISMB 250 OF 1.2 MTR LENGTH. PL REPLY

Design of a bicycle frame, Design of a Bicycle Frame : Figure  depicts a si...

Design of a Bicycle Frame : Figure  depicts a simple bicycle frame, which is to be built of hollow aluminium tubing with outside diameter of 20 mm and wall thickness of 2 mm. The f

If no leak found in the above listed area remove flywheel, If no leak found...

If no leak found in the above listed area remove flywheel: Remove fly wheel and check weather oil leak is from the seal or "o" ring.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd