Reason in checking the ratio, Civil Engineering

Assignment Help:

Reason in checking the ratio (i.e. design flow to full-bore flow > 0.5) in circular pipe design

For checking of self-cleansing velocity for pipes, there is another criterion to check design flow Q to full bore flow Qfull> 0.5. If this criterion is met, it may be assumed that design flow is always greater than self-cleansing velocity.

The reason behind it is that from the chart of circular pipes when Q/ Qfull>0.5 then ratio of design velocity V to full bore velocity Vfull>1. After confirming Vfull>1m/s then it leads to V>1m/s. Therefore minimum velocity at full bore flow must be checked.


Related Discussions:- Reason in checking the ratio

What is atterberg limits tests, What is Atterberg Limits tests? The At...

What is Atterberg Limits tests? The Atterberg Limits tests are designed to determine the plasticity of finer grained soils. These tests are performed on the fraction less than

Classification of timber, Classification of Timber Several bases are co...

Classification of Timber Several bases are considered for the classification of timbers. The following are the essential basis: Mode of growth Modulus of elasticity

How do you maintain water pressure, If you have water pressure and wish to ...

If you have water pressure and wish to handle it, do not cause flow in the line, which will decrease pressure because of friction. To keep pressure up, decrease friction by increas

Can you explain permeable spurs, Q. Can you explain Permeable Spurs? A ...

Q. Can you explain Permeable Spurs? A permeable spur may be constructed by driving two or more rows of bally piles with sufficient penetration below riverbed level to provide a

Concrete, describe in detail the uses of concrete

describe in detail the uses of concrete

What are the limits of any soil classification system, Draw neatly the IS p...

Draw neatly the IS plasticity chart and label the symbol of several soils. What are the limits of any soil classification system? Explain the following tests with their meani

Wet mix macadam - road pavements, Wet Mix Macadam: For heavily traffi...

Wet Mix Macadam: For heavily trafficked highways, the granular bases are constructed using Wet Mix Macadam (WMM). The WMM is a specification in which well graded aggregate is

Main and key benefits of piers constructed monolithically, What are main a...

What are main and key benefits of piers constructed monolithically with bridge deck over usage of bearings?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd