Reason in checking the ratio (i.e. design flow to full-bore flow > 0.5) in circular pipe design
For checking of self-cleansing velocity for pipes, there is another criterion to check design flow Q to full bore flow Qfull> 0.5. If this criterion is met, it may be assumed that design flow is always greater than self-cleansing velocity.
The reason behind it is that from the chart of circular pipes when Q/ Qfull>0.5 then ratio of design velocity V to full bore velocity Vfull>1. After confirming Vfull>1m/s then it leads to V>1m/s. Therefore minimum velocity at full bore flow must be checked.
Assignment:-Continuous Prestressed Concrete Beam Design A cast in-place 3-span prestressed concrete T-beam is to be designed. The T-beam concsists of an 8-in thick reinforced
JETTIES: A jetty is a structure projecting into the sea from the shore line for receiving ships. They are made of RCC trestles with a deck to accommodate railway track and roa
An engineer deposits an "X" amount every 6 months for 3 years so that she'll have $10,000 at the end of this period. The interest rate is 5% per year which is rebalanced every 6-mo
State the Moulds in Prestressed Concrete Moulds for pre-tension work should be sufficiently strong and rigid so that they can withstand the effects of placing and compacting th
Explain the Signalized Intersections Cycle length - the time required for one complete sequence of all signal indications Phase - the right-of-way (green), change (yellow),
Chemical Classification On the basis of their chemical composition engineers prefer to classify rocks as: 1. Silicious rocks 2. Argillaceous rocks 3. Calcare
Ceramics is what type of materials ? Answer: It is an insulators.
hi
Project specifications require a relative compaction of 95% (modified Proctor). Construction of a highway embankment requires 10,000-yd 3 of fill. The borrow soil has an in-situ
Test required before laying or after laying.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd