What is n-value of standard penetration test, Civil Engineering

Assignment Help:

Define and discuss the various factors that help decide the number and depth of bore holes needed for subsoil exploration.

What is 'N-value' of Standard Penetration Test? How do you find the relative density from 'N-value'?

Describe the various corrections to be applied to the observed value of N.

 


Related Discussions:- What is n-value of standard penetration test

Lime, what is stone lime shall lime and kankar lime

what is stone lime shall lime and kankar lime

Explain strain compatibility in mini-piles, Q. Explain Strain compatibility...

Q. Explain Strain compatibility in mini-piles? In designing the axial capacity of mini-piles, grout can be taken into account in the contribution of axial load capacity. Though

Determine the active thrust on the wall, A retaining wall 9 m high retains ...

A retaining wall 9 m high retains granular fill weighing 18 kN/m 3 with level surface. The active thrust on the wall is 180 kN per metre length of the wall. The height of the wall

Explain some important points for hazardous waste, Explain some Important P...

Explain some Important Points for Hazardous Waste The mixture rule prevents dilution of waste for the purposes of escaping RCRA regulation. Mixtures of a listed hazardous w

Dam, how many types of drainage galleries and foundation treatment

how many types of drainage galleries and foundation treatment

3-tap to 6-tap increase water pressure, Will going from a 3-tap to 6-tap i...

Will going from a 3-tap to 6-tap increase water pressure? Ans) No, the pressure will be the similar, you will get more volume only if your pumps can handle the GPM, to enhance p

Find the size of the foundation required, A steam turbine with base 6 m × 3...

A steam turbine with base 6 m × 3.6 m weighs 10,000 kN. It is to be placed on a clay soil with c = 135 kN/m 2 . Find the size of the foundation needed if the factor of safety is to

Designing level of landings in piers, Question What is designing leve...

Question What is designing level of landings in piers? Answer Landings are designed as resting place for passengers throughout berthing and deserting of vessels. I

Mild steel and high yield steel in water-retaining structure, Q. Mild steel...

Q. Mild steel and high yield steel in water-retaining structure? In designing water-retaining structures, movement joints may be installed in parallel with steel reinforcement

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd