Properties a water proofing system, Civil Engineering

Assignment Help:

Q- Mention 5 essential properties a water proofing system should have?

Ans.-

water proofing system should have the following essential properties :-

a) It should be impermeable or should have very low permeability.

b) It should have strong adhesion with substrata.

c) It should be sufficiently elastic so as to withstand expansion and contraction of substrata due to temperature fluctuations.

d) It should have high resistance to abrasion and cracking.

e) It should be resistant to ultra violet rays.


Related Discussions:- Properties a water proofing system

Quantitative Influence Line, Solve the following three questions of the bea...

Solve the following three questions of the beam ABCD. Note that A is a fixed end; B is apin connection; C is a roller support; and D is a free end. 1) Sketch the quantitative

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Pre-tensioned concrete elements, Pre-tensioned concrete elements It is ...

Pre-tensioned concrete elements It is the act of transferring the stress in prestressing tendons to the concrete member. In the case of pre-tensioned concrete elements, this st

Continuous flow systems, Continuous Flow Systems: Transport by road, r...

Continuous Flow Systems: Transport by road, rail, air or ships takes place in vehicles which move along a path at intervals. As against this, continuous flow systems are those

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

Mensuration, My team has to construct a swimming pool at the back of the ho...

My team has to construct a swimming pool at the back of the house. It’s interior dimensions are 10M x 3M and 1M at the shallow end and 2.5M at the deep end. The walls and the bas

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

Plane table surveing, in plane table surveying which activity is done first...

in plane table surveying which activity is done first whether centering or levelling?

Torsion, assumptions made in the simple torsion theory

assumptions made in the simple torsion theory

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd