Q. Production Test Rings?

The frequency for the tests shall be as follows:

• One sample at the 10th joint

• One sample at the 75th joint

• One sample at the 300th joint

• One sample at the 500th joint and every 400th joint thereafter unless the application temperature or some other major procedure is changed.

This will require the removal of 1.5' (0.5 m) of pipe from the appropriate joint and shall be obtained at least 1' (0.3 m) from a pipe end. The Applicator will restencil any identification eliminated through the removal of this pipe on to the pipe joint at no expense to the OWNER.


Related Discussions:- Production test rings

Explain the universal drilling machine, Explain the universal drilling mach...

Explain the universal drilling machine The universal drilling machine, in this machine the arm itself can be rotated by a desired angle along a horizontal axis. This is in addi

Determine tangential and normal stresses, A rectangular block of material i...

A rectangular block of material is subjected to stresses 65N/mm 2 (tensile) in x- direction and 35 N/mm 2 (tensile) in perpendicular direction. It is accompanied by shear stress

Find out the motion of the system, Find out the motion of the system: ...

Find out the motion of the system: Block (A) of mass M A = 40 kg is resting on coarse table having coefficient of friction = 0.1. This is tied up with an inextensible rope (

Help with homework, The crate A of weight W=27lb is being pulled to the rig...

The crate A of weight W=27lb is being pulled to the right by the winch at B. The crate starts at x=0 and is pulled a total distance 15ft over the rough surface for which the coeffi

#totto cycleitle.., for an otto cycle, compression ratio=8.5:1,air inlet=15...

for an otto cycle, compression ratio=8.5:1,air inlet=15degree celsius and pressure=101.3kpa, maximum cycle temperature= 1800degree celsius, what is temperature after compression,te

Surface modeling, SURFACE MODELING: The process of modeling is built m...

SURFACE MODELING: The process of modeling is built much easier for a mathematical description of an object or at least on a part of the object might be applied. Surfaces might

Surface preparation and coating, Q. Surface Preparation and Coating? Ve...

Q. Surface Preparation and Coating? Vendor shall chemically clean all foreign material and commercially sandblast (SSPC-SP-10) mill scale and rust from all surfaces to be paint

Simply supported beam.., how to calculate the distribution of shear force a...

how to calculate the distribution of shear force and bending moment for a simply supported beam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd