Kid style, International, makes furniture designed for children. Its most popular items are large and small toy boxes. Demand for toy boxes has over loaded its MPS, and the company does not know how it will meet demand.

1. Given the following BOM, MPS, and Inventory Master File, generate MRP
matrices for each item and identify orders that are past due.




Product Structure for Large and Small Boxes

Large toy box





Large housing Hardware Decals




Small toy box





Small housing Hardware Decals




Master Production Schedule

Item 1 2 3 4 5 6 7 8
Large toy box 30 60 30
Small toy box 25 45 60 30

Item Master File

Item On
Hand LT Lot Size
(multiples) Scheduled Receipt
Period Quantity Unit
Value $
Large toy box 30 2 50 - - 50.00


Small toy box 25 2 1 - - 30.00
Large housing 35 2 100 - - 15.00
Small housing 45 2 75 - - 10.00
Hardware 55 2 40 2 40 5.00
Decals 50 2 1 2 50 5.00

Kid style’s Scheduling Notes and Policies

1. Monthly sales forecast should be met within plus or minus 10%.
2. Delay of a customer’s order costs 10% of the value of the order per week.
3. Customer order may be delayed a maximum of two weeks.
4. It is possible to halve lead time, but the cost of producing or ordering the item increases by 50% (e.g. workers get paid time and a half for overtime)



Pegging Report

Requirements
Item Period Quantity Type Reference
Small toy box 1 25 MS-CO B070002
3 45 MS-CO B070002
4 30 MS-CO B064444
4 30 MS-FO Z842009
6 30 MS-FO
Large toy box 2 30 MS-CO A080100
4 30 MS-CO B064444
4 30 MS-FO Z900620
6 30 MS-FO

Related Discussions:- PRODUCTION PLANNING & CONTROL

Show construction subcontractor responsibilities, Q. Show Construction Subc...

Q. Show Construction Subcontractor Responsibilities? The Supplier or Construction Subcontractor is responsible for: • Employing qualified PMI technicians • Performing PMI

How can you implement permeability test, Q. How can you implement Permeabil...

Q. How can you implement Permeability test  As already defined, permeability of porosity of the moulding sand is the message of its ability to permit air to flow through it.

Nature of bending stress, According to the explanation, why reverse will ha...

According to the explanation, why reverse will happen in the case of cantilevers? ( that is, tensile stresses will be induced in upper layers and compressive stresses will be induc

Physics, Ask question #Minimum 1010 words accepted#

Ask question #Minimum 1010 words accepted#

Explain process of casting and modeling, Explain desirable properties of mo...

Explain desirable properties of modeling and differentiate between the process of casting and modeling. Also highlight the advantages and disadvantages of casting process and model

Working of steam engine , Working of stream engine: The high pressure ...

Working of stream engine: The high pressure steam from boiler is supplied to the steam chest. The high pressure steam enters cylinder through inlet port and exerts pressure on

., what is fluid?

what is fluid?

Designing the cast iron housing for a heavy duty machines, Provide the vari...

Provide the various considerations to be taken in designing the cast iron housing for a heavy duty machines?

Engine management system, A preamble to engine management systems for IC en...

A preamble to engine management systems for IC engines objectives, functionalities and main features

Counterclockwise direction, Figure presents a gearbox that you are going to...

Figure presents a gearbox that you are going to design. The input shaft rotates at n1= 1500 rpm in a counterclockwise direction. The gearbox is needed to be designed sothat the out

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd