Production option and the ato process design, Operation Research

Assignment Help:

The plant is using the chase production option and the ATO process design. The BOM is illustrated below.

585_Untitled.png

 

Requirement

The factory works on a process layout but the order lot sizing is open for determination. Verify the optimal method for lot sizing.

Questions:

 

What is BOM?

 

What is 2 to 1?  1 to 1?

 

 


Related Discussions:- Production option and the ato process design

Modi method, find optimal solution for a 3*4 matrix 42 27 24 35 46 37 32 3...

find optimal solution for a 3*4 matrix 42 27 24 35 46 37 32 32 40 40 30 35 using modi method

Linear Programming Problem using Simple method, Solve the following Linear ...

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

Preparation of visual aids , Preparation of visual Aids ,Handouts and Feedb...

Preparation of visual Aids ,Handouts and Feedback Forms It is   always  better to prepare  visual  aids much  in advance of the presentation. Leaving  them for the  last mo

Calculation of standard deviation - discrete series, Calculation  of Stand...

Calculation  of Standard Deviation - Discrete Series   There are three methods for  calculating  standard  deviation  in discrete series": a. Actual Mean Methods: It inc

Problems based on lpp when feasible region is unbounded, Problems based on ...

Problems based on LPP when feasible region is unbounded.     1.    Minimize z = 3x + 5y subject to constraints  X + y ≥ 2 X + 3y ≥ 3 X, y ≥ 0 script

Students t distribution - hypothesis testing, Normal 0 false ...

Normal 0 false false false EN-IN X-NONE X-NONE

Classification of documents - books, Books: Books form  one of the pri...

Books: Books form  one of the primary sources of information. They provide a cohesively organised (thought content) information on a specific subject of optimum depth. Since b

Mk, Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = ...

Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd