Production option and the ato process design, Operation Research

Assignment Help:

The plant is using the chase production option and the ATO process design. The BOM is illustrated below.

585_Untitled.png

 

Requirement

The factory works on a process layout but the order lot sizing is open for determination. Verify the optimal method for lot sizing.

Questions:

 

What is BOM?

 

What is 2 to 1?  1 to 1?

 

 


Related Discussions:- Production option and the ato process design

Scope, With practical example

With practical example

Sequencing, how the sequencing techniques help the manager

how the sequencing techniques help the manager

Evolutionary methods, This methods studies development from simpler forms...

This methods studies development from simpler forms through a long series of a small change. Each change by itself results in minor modification in the phenomenon but the

Linear programming solution by steps for two-phase method, Solve by Steps f...

Solve by Steps for Two-Phase Method Max Z = 5x 1 + 8x 2 Subject to 3x 1 + 2x 2 ≥ 3 x 1 + 4x 2 ≥ 4 x 1 + x 2 ≤ 5     &     x 1 ≥ 0, x 2  ≥ 0 Answe

Answer, A paper mill produces two grades of paper viz., X and Y. Because of...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Duality, maximum 3x1+x2+x3-x4 subject to x1+5x2+3x3+4x4 x1+x2=-1 x3+x4

maximum 3x1+x2+x3-x4 subject to x1+5x2+3x3+4x4 x1+x2=-1 x3+x4

Linear programming, A paper mill produces two grades of paper viz., X and Y...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Line balancing, what will happen when line balance doesn not exist

what will happen when line balance doesn not exist

Assignment SMU, A paper mill produces two grades of paper viz., X & Y. Bec...

A paper mill produces two grades of paper viz., X & Y. Because of raw material restrictions, it cannot produce more 400 tons of grade X paper & 300 tons of grade Y paper in a week.

Non parametric tests - hypothesis testing, NON PARAMETRIC TESTS All  ...

NON PARAMETRIC TESTS All  practical  data follow normal distribution under  such situations can estimate the  parameters such  as mean  variance etc ,,, and use the  standard

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd