Production and Development Process
The traditional approach to product development stresses on a rigid sequence of steps. Usually R&D engineers exclude the manufacture process and purchase process during the product design stage. R&D engineers normally assume that process engineers/manufacturing engineers could develop the processes required for a new product. The prototype model of the new product under development goes through the universal production process to prove the concept, and for initial trials, without using the mass production techniques, tools, and fixtures. As a result, the process time for manufacturing is extended and the expenses also increase.
After the completion of design, to prevent high cost and long time consumed in development, a system of concurrent activity of production and development is created. In this system, the designer and processor work in close coordination with each other, which results in considerable reduction in the development cycles.
This has gained high level of importance in the present scenario of high costs and severe competition. It is called as simultaneous engineering or concurrent engineering. The traditional approach of sequential activity of product and process design is replaced by concurrent operation of development and design, by cross-functional teams consisting of representatives from product design, process design, quality, production planning and so on. The results of simultaneous engineering are reduced time to market, reduced product cost, and better quality.
Question : (a) What are the skills required from change agents in order to manage the different kinds of change effectively? (b) What are the four basic change management st
C hallenges Quality improvement can create conflicting situations and could result in complications. Project team members may be disillusioned by the past failures. The past e
Internet - Definition A great majority of people are now aware of the existence of Internet But, many of them have perhaps a some what misguided view of what the Internet rea
Card Form: Library catalogue in the card form is by far the most popular physical form. It is widely prevalent in libraries throughout the world including India. In this form
Question 1 What are securities? Describe the features of various types of securities Question 2 What are the main features of corporate bonds? Question 3 Define risk. Wh
Organisational Framework for Project Management A project based organisation is a composition that facilitates the coordination and implementation of project behaviours. Projec
The areas to be considered while monitoring and controlling a contract are wide spread. They are: P h y sical mobilisation: In this stage, the contractor gathers people, m
Alphabetical index: The alphabetical index to a classified catalogue; consisting of author, title (wherever necessary), subject entries and other entries for collaborators, se
Loose assemblage is assembling together of two or more of: subjects (basic or compound) isolate ideas (in one and the same facet, or isolate ideas in one and the same array)
QUESTION 1 Write short notes on the following (a) Observation method (b) Pavlov's classical conditioning (c) Experimental method (d) Reinforcement QUESTION 2
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd