1. The cantilever beam-like structure shown below is modeled using a 2 x 10 mesh of rectangular four-node plane stress elements of equal size. Do the following and compare with the beam theory solution. (a) Construct the element matrix numerically using the 2x2 point rule.
(b) Plot vertical displacement along the line.
(c) Plot stress values at the element centroids.
what is the permissible limit of sand
Q. Shoes of prefabricated drains? Shoes are generally installed in prefabricated drains for the below : (i) It avoids the entry of soils in the mandrel by sealing it at the
Q. Explain about Castellated beams? Castellated beams refer to the type of beams which involve expanding a standard rolled steel section in such a way that a predetermined patt
Define Underwater inspection methods - inspection of bridge? Method for underwater inspection of a bridge depends on type and extent of damage expected, inspection intensity le
Determine about the long-term deflections For long-term deflections, the total long-term deflection due to the prestressing force, dead load and any sustained imposed load may
Prestressed concrete poles In the past decades, prestressed concrete poles have become popular and have replaced the traditional poles made of timber, steel or reinforced con
A mat foundation of 15 m x 15 m and weighing 20000 N/m 2 is to be constructed on the surface of a soil strata. The profile is given in Figure. The number of squares enclosed i
Differentiate between concrete and tendons In the case of pre-tensioned concrete members, the transfer of prestress takes place due to the bond between concrete and tendons. In
Question Explain components of a typical expansion joint? Answer Dowel bar-This is major component of joint. It serves to guide direction of movement of concrete growth. Therefo
Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd