Obtain maximum positive moment in a span of continuous beam, Civil Engineering

Assignment Help:

Reason of loading on alternative spans to obtain maximum positive moment in a span of a continuous beam

To attain a maximum sagging moment in a span of a continuous beam, general rule is to load the span under consideration and alternative spans on every side of the span. To account for this rule, let us consider the subsequent example. For illustration loads are applied to the mid-span of a multiple-span continuous beam. It is noticed that this loads induce positive moments near mid-span in all even spans. Thus if all even spans are loaded concurrently this will result in the increase of positive moments in all other loaded spans.  

In the same way to obtain maximum negative moment at a support, load adjacent spans of support and then alternative spans on every side.


Related Discussions:- Obtain maximum positive moment in a span of continuous beam

Determine the statement about construction earthwork, Which of the followin...

Which of the following statements about construction earthwork are true: I.  The volume of earth known in its natural state is known as bank-measure; in-situ; in-place; virgin

Fluid mechanics , i have three civil engineering fluid mechanics. 1 manomet...

i have three civil engineering fluid mechanics. 1 manometer problem 2 estimate the discharge for a channel 3 pipe system - direction of flow in line and what the value of flow in l

Explain foundation design discharge for a bridge, Q. Explain Foundation des...

Q. Explain Foundation design discharge for a bridge? To provide for an adequate margin of safety against any abnormal flood exceeding the design discharge (Q), the foundations,

Strength of Materials, Describe the process of yielding and state the effec...

Describe the process of yielding and state the effect work hardening has on the yield point of mild steel using suitable sketches where appropriate.

Phase, Each physical homogeneous type (solid, liquid orvapour) is a phase. ...

Each physical homogeneous type (solid, liquid orvapour) is a phase. Two or three phases may coexist.  e.g. Ice and water at 0 o C.  Mixtures of gases (e.g. Air) can only be

Sub-base for concrete carriageway - non-strength provider, Sub-base for con...

Sub-base for concrete carriageway - non-strength provider Essentially sub-base for a concrete carriageway is provided for the below reasons: (i)  It provides aneven and smo

Tests on bricks, Tests on Bricks The following laboratory tests can be...

Tests on Bricks The following laboratory tests can be conducted on the bricks to find their suitability: 1.    Crushing strength 2.    Absorption 3.    Shape and size

Tension member, Explain various forms of tension members.

Explain various forms of tension members.

Precaution of damp, i need simple ans for this question tell me precaution ...

i need simple ans for this question tell me precaution of dampness

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd